Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,239
matching recommendationsSIC | 22 | Textile Mill Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0777 # 01 Y:2004 | 01 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,136 | $0 | Implemented |
GT0777 # 02 Y:2004 | 02 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $14,877 | $800 | Implemented |
GT0777 # 03 Y:2004 | 03 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,295 | $1,400 | Implemented |
GT0777 # 04 Y:2004 | 04 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $10,122 | $10,970 | Implemented |
GT0777 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,910 | $1,000 | Implemented |
GT0777 # 06 Y:2004 | 06 | 2004 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,122 | $2,320 | Implemented |
GT0777 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,878 | $81,651 | n/a |
GT0777 # 08 Y:2004 | 08 | 2004 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $13,327 | $20,670 | n/a |
GT0776 # 01 Y:2004 | 01 | 2004 | CONTROL PRESSURE ON STEAMER OPERATIONS | $1,335 | $0 | n/a |
GT0776 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,581 | $550 | n/a |
GT0776 # 03 Y:2004 | 03 | 2004 | INSULATE BARE EQUIPMENT | $330 | $83 | n/a |
GT0776 # 04 Y:2004 | 04 | 2004 | IMPROVE LUBRICATION PRACTICES | $14,283 | $0 | n/a |
GT0776 # 05 Y:2004 | 05 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $11,980 | $13,020 | n/a |
GT0776 # 06 Y:2004 | 06 | 2004 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $649 | $530 | n/a |
GT0776 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $51,823 | $73,750 | n/a |
GT0776 # 08 Y:2004 | 08 | 2004 | REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE | $37,139 | $76,240 | n/a |
GT0776 # 09 Y:2004 | 09 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,188 | $32,362 | n/a |
GT0776 # 10 Y:2004 | 10 | 2004 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $9,120 | $16,200 | n/a |
GT0776 # 11 Y:2004 | 11 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $18,496 | $100,000 | n/a |
NC0274 # 01 Y:2003 | 01 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $18,125 | $77,500 | Not Implemented |
NC0274 # 02 Y:2003 | 02 | 2003 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $36,152 | $81,000 | Not Implemented |
NC0274 # 03 Y:2003 | 03 | 2003 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,209 | $200 | Implemented |
NC0274 # 04 Y:2003 | 04 | 2003 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $9,743 | $36,000 | Not Implemented |
NC0274 # 05 Y:2003 | 05 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,021 | $1,000 | Implemented |
NC0274 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,705 | $2,885 | Not Implemented |