IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,239

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0267 # 07 Y:2003 07 2003 RECOVER AND REUSE COOLING WATER $64,159 $0 Not Implemented
WI0447 # 01 Y:2003 01 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $62,019 $150,000 Not Implemented
WI0447 # 02 Y:2003 02 2003 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $6,058 $4,500 Implemented
WI0447 # 03 Y:2003 03 2003 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $2,071 $2,000 Not Implemented
WI0447 # 04 Y:2003 04 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $381 $740 Not Implemented
WI0447 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $1,938 $2,600 Implemented
MA0534 # 01 Y:2003 01 2003 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $223,213 $1,257,060 Not Implemented
MA0534 # 02 Y:2003 02 2003 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $76,320 $57,480 Not Implemented
MA0534 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,487 $53,950 Not Implemented
MA0534 # 04 Y:2003 04 2003 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $20,457 $67,665 Not Implemented
MA0534 # 05 Y:2003 05 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $19,634 $12,975 Not Implemented
MA0534 # 06 Y:2003 06 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $10,591 $8,425 Not Implemented
MA0534 # 07 Y:2003 07 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $6,624 $21,000 Not Implemented
MA0534 # 08 Y:2003 08 2003 RECOVER WASTE HEAT FROM EQUIPMENT $4,663 $9,742 Not Implemented
MA0534 # 09 Y:2003 09 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $470 $1,416 Not Implemented
GT0754 # 01 Y:2003 01 2003 BURN A LESS EXPENSIVE GRADE OF FUEL $24,451 $69,000 Implemented
GT0754 # 02 Y:2003 02 2003 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $146,600 $104,000 Implemented
GT0754 # 03 Y:2003 03 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,080 $0 Implemented
GT0754 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $788 $1,731 Not Implemented
GT0754 # 05 Y:2003 05 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $840 $678 Implemented
GT0754 # 06 Y:2003 06 2003 INCREASE AMOUNT OF CONDENSATE RETURNED $87,548 $12,750 Implemented
GT0754 # 07 Y:2003 07 2003 COVER OPEN TANKS $16,490 $6,500 Not Implemented
GT0754 # 08 Y:2003 08 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,324 $2,271 Implemented
GT0754 # 09 Y:2003 09 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,607 $1,414 Implemented
GT0754 # 10 Y:2003 10 2003 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $26,325 $5,750 Not Implemented