IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0742 # 08 Y:2015 08 2015 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $4,024 $11,650 Implemented
MA0742 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,465 $11,685 Implemented
MA0742 # 05 Y:2015 05 2015 RECOVER WASTE HEAT FROM EQUIPMENT $8,116 $9,000 Implemented
MA0742 # 03 Y:2015 03 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $24,583 $5,560 Implemented
MA0742 # 02 Y:2015 02 2015 OPTIMIZE PLANT POWER FACTOR $38,357 $25,972 Implemented
ME0269 # 10 Y:1999 10 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $2,179 $2,000 Implemented
ME0269 # 15 Y:1999 15 1999 MINIMIZE WATER USAGE $229 $100 Implemented
ME0269 # 13 Y:1999 13 1999 INSULATE BARE EQUIPMENT $547 $273 Implemented
ME0269 # 12 Y:1999 12 1999 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,273 $1,632 Implemented
ME0269 # 08 Y:1999 08 1999 INSULATE BARE EQUIPMENT $4,461 $650 Implemented
ME0269 # 07 Y:1999 07 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,202 $10,069 Implemented
ME0269 # 06 Y:1999 06 1999 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $6,530 $21,460 Implemented
ME0269 # 05 Y:1999 05 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,299 $10,600 Implemented
ME0269 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,324 $1,000 Implemented
ME0269 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,778 $56,288 Implemented
MA0224 # 04 Y:1991 04 1991 REPAIR OR REPLACE STEAM TRAPS $21,213 $35,000 Implemented
MA0224 # 08 Y:1991 08 1991 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,542 $1,060 Implemented
MA0224 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,079 $16,200 Implemented
MA0224 # 07 Y:1991 07 1991 INSULATE BARE EQUIPMENT $1,859 $2,250 Implemented
MA0117 # 05 Y:1988 05 1988 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $340 $0 Implemented
MA0117 # 04 Y:1988 04 1988 INSTALL TIMERS AND/OR THERMOSTATS $240 $75 Implemented
MA0117 # 02 Y:1988 02 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $625 $105 Implemented
MA0032 # 07 Y:1985 07 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $485 $120 Implemented
MA0032 # 06 Y:1985 06 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,902 $2,400 Implemented