IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0278 # 10 Y:2009 10 2009 OPTIMIZE PLANT POWER FACTOR $7,344 $28,458 Implemented
SU0278 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,049 $6,721 Implemented
SU0278 # 06 Y:2009 06 2009 INSTALL OCCUPANCY SENSORS $44,212 $7,299 Implemented
SU0278 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,615 $410 Implemented
SU0278 # 04 Y:2009 04 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,305 $528 Implemented
SU0278 # 03 Y:2009 03 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,050 $0 Implemented
SU0278 # 01 Y:2009 01 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $25,359 $0 Implemented
SU0223 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,353 $135 Implemented
SU0210 # 01 Y:2005 01 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,587 $0 Implemented
SU0210 # 05 Y:2005 05 2005 PREHEAT COMBUSTION AIR WITH WASTE HEAT $28,070 $35,100 Implemented
SU0210 # 04 Y:2005 04 2005 USE SYNTHETIC LUBRICANT $1,943 $1,000 Implemented
SU0210 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $328 $143 Implemented
SU0112 # 06 Y:2001 06 2001 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $10,560 $120,000 Implemented
SU0112 # 03 Y:2001 03 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $2,827 $2,088 Implemented
SU0112 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $319 $0 Implemented
MA0412 # 05 Y:1998 05 1998 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $925 $403 Implemented
MA0412 # 04 Y:1998 04 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,686 $3,400 Implemented
MA0412 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,088 $323 Implemented
MA0412 # 01 Y:1998 01 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $25,681 $7,454 Implemented
HO0136 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $211 $905 Implemented
HO0136 # 05 Y:1996 05 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,736 $6,500 Implemented
HO0136 # 04 Y:1996 04 1996 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $47,059 $145,000 Implemented
HO0136 # 03 Y:1996 03 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $96 $200 Implemented
HO0132 # 04 Y:1996 04 1996 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $23,949 $13,764 Implemented
HO0132 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $688 $937 Implemented