IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

70

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0155 # 06 Y:1998 06 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,598 $1,280 Implemented
WV0155 # 08 Y:1998 08 1998 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $75 $0 Implemented
WV0155 # 07 Y:1998 07 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $712 $670 Implemented
WV0155 # 01 Y:1998 01 1998 REDUCE VENTILATION AIR $1,704 $708 Implemented
WV0155 # 05 Y:1998 05 1998 INSULATE BARE EQUIPMENT $24,472 $4,450 Implemented
NC0141 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,183 $4,236 Implemented
NC0141 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $556 $60 Implemented
NC0141 # 02 Y:1998 02 1998 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $5,943 $10,000 Implemented
NC0141 # 04 Y:1998 04 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $31,048 $4,000 Implemented
NC0141 # 07 Y:1998 07 1998 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,861 $200 Implemented
GT0645 # 04 Y:1998 04 1998 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $34,362 $22,000 Implemented
GT0645 # 01 Y:1998 01 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $20,559 $10,000 Implemented
GT0645 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $1,810 $7,000 Implemented
UF0208 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,451 $2,600 Implemented
UF0208 # 07 Y:1998 07 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,269 $0 Implemented
UF0208 # 09 Y:1998 09 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,125 $0 Implemented
UF0208 # 11 Y:1998 11 1998 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $24,315 $50 Implemented
UF0208 # 12 Y:1998 12 1998 $13,843 $0 Implemented
MA0417 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $246 $195 Implemented
MS0115 # 08 Y:1998 08 1998 $181,522 $600,000 Implemented
MS0115 # 09 Y:1998 09 1998 $274,300 $60,000 Implemented
MS0115 # 01 Y:1998 01 1998 INSTALL TIMERS AND/OR THERMOSTATS $130 $335 Implemented
MS0115 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $101 $384 Implemented
MS0115 # 04 Y:1998 04 1998 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $62,615 $4,720 Implemented
MS0115 # 06 Y:1998 06 1998 METER WASTE WATER $1,274 $0 Implemented