Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
151
matching recommendationsSIC | 2211 | Broadwoven Fabric Mills, Cotton |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0970 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $93,953 | $385,000 | Implemented |
GT0970 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,675 | $1,850 | Implemented |
GT0970 # 02 Y:2023 | 02 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,613 | $75 | Implemented |
GT0970 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $37,757 | $200 | Implemented |
UU0175 # 01 Y:2021 | 01 | 2021 | ELIMINATE/REDUCE AN OPERATION | $154,852 | $42,000 | Implemented |
UU0175 # 03 Y:2021 | 03 | 2021 | REPLACE BOILER | $8,979 | $46,872 | Implemented |
UU0175 # 02 Y:2021 | 02 | 2021 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $31,653 | $35,841 | Implemented |
UU0175 # 05 Y:2021 | 05 | 2021 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $4,532 | $6,178 | Implemented |
GT0921 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $947 | $3,500 | Implemented |
CL1804 # 01 Y:2018 | 01 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $156,853 | $28,500 | Implemented |
CL1804 # 04 Y:2018 | 04 | 2018 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $39,409 | $3,050 | Implemented |
CL1804 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $46,306 | $184,601 | Implemented |
NC0493 # 10 Y:2013 | 10 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,165 | $100 | Implemented |
NC0493 # 13 Y:2013 | 13 | 2013 | CONDENSE OPERATION INTO ONE BUILDING | $21,473 | $10,000 | Implemented |
NC0493 # 09 Y:2013 | 09 | 2013 | REDUCE EXCESSIVE BOILER BLOWDOWN | $430 | $0 | Implemented |
NC0493 # 05 Y:2013 | 05 | 2013 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $37,850 | $6,372 | Implemented |
NC0493 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,550 | $1,386 | Implemented |
NC0493 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $40,789 | $215,791 | Implemented |
GT0842 # 06 Y:2007 | 06 | 2007 | USE WATER-BASED ADHESIVES | $1,960 | $0 | Implemented |
GT0842 # 01 Y:2007 | 01 | 2007 | INSTALL / REPAIR INSULATION ON STEAM LINES | $5,980 | $1,603 | Implemented |
GT0842 # 05 Y:2007 | 05 | 2007 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,090 | $3,900 | Implemented |
GT0842 # 07 Y:2007 | 07 | 2007 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $63,520 | $7,000 | Implemented |
MS0310 # 01 Y:2007 | 01 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,634 | $7,425 | Implemented |
MS0310 # 03 Y:2007 | 03 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $755 | $144 | Implemented |
MS0310 # 04 Y:2007 | 04 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $105 | $82 | Implemented |