IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

143

matching recommendations
Reset
SIC 2241 Narrow Fabric Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0547 # 06 Y:2004 06 2004 INSTALL TIMERS AND/OR THERMOSTATS $14,705 $4,020 Not Implemented
MA0547 # 07 Y:2004 07 2004 USE MINIMUM STEAM OPERATING PRESSURE $13,419 $0 Not Implemented
MA0547 # 08 Y:2004 08 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,117 $6,600 Not Implemented
MA0547 # 09 Y:2004 09 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,321 $10,950 Not Implemented
MA0547 # 10 Y:2004 10 2004 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,829 $7,475 Not Implemented
MA0547 # 11 Y:2004 11 2004 ADD AREA LIGHTING SWITCHES $1,964 $2,400 Not Implemented
MA0547 # 12 Y:2004 12 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,376 $825 Not Implemented
MA0547 # 13 Y:2004 13 2004 RECOVER WASTE HEAT FROM EQUIPMENT $349 $1,400 Not Implemented
NC0243 # 01 Y:2002 01 2002 INSULATE BARE EQUIPMENT $1,453 $3,876 Not Implemented
NC0243 # 02 Y:2002 02 2002 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,063 $1,500 Not Implemented
NC0243 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $236 $50 Implemented
NC0243 # 04 Y:2002 04 2002 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $1,543 $6,300 Implemented
NC0243 # 05 Y:2002 05 2002 REPAIR AND ELIMINATE STEAM LEAKS $4,291 $2,500 Implemented
NC0243 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $200 $125 Not Implemented
NC0243 # 07 Y:2002 07 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $682 $351 Not Implemented
NC0243 # 08 Y:2002 08 2002 DEVELOP A REPAIR/REPLACE POLICY $820 $1,753 Implemented
SU0112 # 01 Y:2001 01 2001 $3,042 $30 Not Implemented
SU0112 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $319 $0 Implemented
SU0112 # 03 Y:2001 03 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $2,827 $2,088 Implemented
SU0112 # 04 Y:2001 04 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,183 $90 Not Implemented
SU0112 # 05 Y:2001 05 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $421 $0 Not Implemented
SU0112 # 06 Y:2001 06 2001 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $10,560 $120,000 Implemented
SU0112 # 07 Y:2001 07 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $223 $0 Not Implemented
ND0294 # 01 Y:1998 01 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,258 $300 Implemented
ND0294 # 02 Y:1998 02 1998 $2,729 $0 Implemented