IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

522

matching recommendations
Reset
SIC 225 Knitting Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0295 # 05 Y:2004 05 2004 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $288 $500 Not Implemented
NC0285 # 01 Y:2004 01 2004 RECOVER AND REUSE COOLING WATER $84,488 $67,500 Not Implemented
NC0285 # 02 Y:2004 02 2004 RECOVER AND REUSE COOLING WATER $7,258 $8,763 Not Implemented
NC0285 # 03 Y:2004 03 2004 RECOVER AND REUSE COOLING WATER $29,869 $5,075 Not Implemented
NC0285 # 04 Y:2004 04 2004 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $956 $1,380 Not Implemented
NC0285 # 05 Y:2004 05 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $48,918 $20,000 Not Implemented
NC0285 # 06 Y:2004 06 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $9,991 $1,000 Not Implemented
NC0285 # 07 Y:2004 07 2004 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $11,507 $23,675 Not Implemented
NC0285 # 08 Y:2004 08 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,454 $500 Not Implemented
MA0534 # 01 Y:2003 01 2003 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $223,213 $1,257,060 Not Implemented
MA0534 # 02 Y:2003 02 2003 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $76,320 $57,480 Not Implemented
MA0534 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,487 $53,950 Not Implemented
MA0534 # 04 Y:2003 04 2003 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $20,457 $67,665 Not Implemented
MA0534 # 05 Y:2003 05 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $19,634 $12,975 Not Implemented
MA0534 # 06 Y:2003 06 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $10,591 $8,425 Not Implemented
MA0534 # 07 Y:2003 07 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $6,624 $21,000 Not Implemented
MA0534 # 08 Y:2003 08 2003 RECOVER WASTE HEAT FROM EQUIPMENT $4,663 $9,742 Not Implemented
MA0534 # 09 Y:2003 09 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $470 $1,416 Not Implemented
MS0217 # 01 Y:2002 01 2002 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $236,267 $271,000 Not Implemented
MS0217 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,022 $38,355 Not Implemented
MS0217 # 03 Y:2002 03 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,081 $35,838 Not Implemented
MS0217 # 04 Y:2002 04 2002 INSTALL OCCUPANCY SENSORS $5,071 $799 Not Implemented
MS0217 # 05 Y:2002 05 2002 INSTALL TIMERS AND/OR THERMOSTATS $1,593 $591 Not Implemented
MS0217 # 06 Y:2002 06 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,555 $3,249 Not Implemented
MS0217 # 07 Y:2002 07 2002 INSULATE BARE EQUIPMENT $1,276 $1,003 Not Implemented