Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
34
matching recommendationsSIC | 226 | Textile Finishing, Except Wool |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0889 # 01 Y:2012 | 01 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,925 | $1,000 | Not Implemented |
GT0889 # 02 Y:2012 | 02 | 2012 | REPAIR OR REPLACE STEAM TRAPS | $14,795 | $8,500 | Not Implemented |
GT0889 # 03 Y:2012 | 03 | 2012 | INSULATE BARE EQUIPMENT | $4,743 | $3,920 | Not Implemented |
GT0889 # 04 Y:2012 | 04 | 2012 | REDUCE EXCESS STEAM BLEEDING | $19,253 | $45,075 | Not Implemented |
GT0889 # 05 Y:2012 | 05 | 2012 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $24,926 | $6,000 | Not Implemented |
GT0708 # 07 Y:2001 | 07 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,650 | $21,400 | Implemented |
GT0708 # 06 Y:2001 | 06 | 2001 | REPAIR OR REPLACE STEAM TRAPS | $9,164 | $10,500 | Implemented |
GT0708 # 05 Y:2001 | 05 | 2001 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $132,090 | $60,000 | Not Implemented |
GT0708 # 04 Y:2001 | 04 | 2001 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $38,843 | $13,500 | Implemented |
GT0708 # 03 Y:2001 | 03 | 2001 | COMBINE UTILITY METERS | $11,677 | $1,000 | Not Implemented |
GT0708 # 02 Y:2001 | 02 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,765 | $0 | Implemented |
GT0708 # 01 Y:2001 | 01 | 2001 | MOVE BOILER TO MORE EFFICIENT LOCATION | $7,140 | $0 | Implemented |
TN0580 # 01 Y:1996 | 01 | 1996 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $18,501 | $38,600 | Not Implemented |
TN0580 # 04 Y:1996 | 04 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $811 | $394 | Not Implemented |
TN0580 # 05 Y:1996 | 05 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $278 | $170 | Not Implemented |
TN0580 # 02 Y:1996 | 02 | 1996 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,167 | $5,110 | Implemented |
TN0580 # 03 Y:1996 | 03 | 1996 | INSTALL TIMERS AND/OR THERMOSTATS | $3,848 | $520 | Implemented |
NC0051 # 07 Y:1995 | 07 | 1995 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $3,190 | $0 | Implemented |
NC0051 # 08 Y:1995 | 08 | 1995 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $24,714 | $18,000 | Not Implemented |
NC0051 # 09 Y:1995 | 09 | 1995 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,325 | $3,800 | Not Implemented |
NC0051 # 01 Y:1995 | 01 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,276 | $570 | Not Implemented |
NC0051 # 02 Y:1995 | 02 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,978 | $420 | Implemented |
NC0051 # 03 Y:1995 | 03 | 1995 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,450 | $12,000 | Not Implemented |
NC0051 # 04 Y:1995 | 04 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,438 | $4,430 | Implemented |
NC0051 # 05 Y:1995 | 05 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,206 | $1,960 | Not Implemented |