IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

249

matching recommendations
Reset
SIC 2269 Finishing Plants, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0204 # 03 Y:2000 03 2000 DISCONNECT BALLASTS $2,900 $6,800 Implemented
NC0204 # 04 Y:2000 04 2000 AVOID REWINDING MOTORS MORE THAN TWICE $1,634 $1,282 Not Implemented
NC0204 # 05 Y:2000 05 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,960 $730 Implemented
NC0204 # 06 Y:2000 06 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,422 $1,100 Implemented
NC0204 # 07 Y:2000 07 2000 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,074 $1,000 Implemented
NC0204 # 08 Y:2000 08 2000 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $27,524 $15,000 Not Implemented
NC0204 # 09 Y:2000 09 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $421 $90 Implemented
NC0204 # 10 Y:2000 10 2000 RECOVER WASTE HEAT FROM EQUIPMENT $2,603 $3,000 Not Implemented
NC0204 # 11 Y:2000 11 2000 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $375 $500 Implemented
GT0671 # 01 Y:1999 01 1999 BURN A LESS EXPENSIVE GRADE OF FUEL $103,610 $28,000 Not Implemented
GT0671 # 02 Y:1999 02 1999 COMBINE UTILITY METERS $2,970 $0 Not Implemented
GT0671 # 03 Y:1999 03 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $20,745 $900 Not Implemented
GT0671 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,420 $600 Not Implemented
GT0671 # 05 Y:1999 05 1999 REPAIR AND ELIMINATE STEAM LEAKS $1,840 $600 Not Implemented
GT0671 # 06 Y:1999 06 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $900 $1,040 Not Implemented
GT0671 # 07 Y:1999 07 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,872 $20,086 Not Implemented
GT0671 # 08 Y:1999 08 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $63,700 $96,450 Not Implemented
GT0671 # 09 Y:1999 09 1999 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $15,000 $70,000 Not Implemented
GT0667 # 01 Y:1999 01 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $122 $350 Not Implemented
GT0667 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $162 $50 Implemented
GT0667 # 03 Y:1999 03 1999 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $182 $0 Not Implemented
GT0667 # 04 Y:1999 04 1999 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $62 $200 Not Implemented
GT0667 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,292 $18,568 Implemented
GT0667 # 06 Y:1999 06 1999 MOVE PRODUCT USING MECHANICAL MEANS $52,560 $8,050 Not Implemented
GT0667 # 07 Y:1999 07 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $1,740 $1,719 Not Implemented