IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

190

matching recommendations
Reset
SIC 2269 Finishing Plants, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0003 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $250 $450 Not Implemented
TT0003 # 06 Y:2007 06 2007 RECOVER WASTE HEAT FROM EQUIPMENT $3,379 $1,500 Not Implemented
TT0003 # 02 Y:2007 02 2007 REPLACE BOILER $1,896 $15,000 Not Implemented
TT0003 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,406 $5,360 Not Implemented
TT0003 # 10 Y:2007 10 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,574 $1,100 Not Implemented
TT0003 # 08 Y:2007 08 2007 USE COMPRESSOR AIR FILTERS $1,524 $400 Not Implemented
TT0003 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,338 $42,670 Not Implemented
TT0003 # 01 Y:2007 01 2007 OPTIMIZE PLANT POWER FACTOR $9,260 $30,000 Not Implemented
TT0003 # 11 Y:2007 11 2007 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,824 $0 Not Implemented
TT0003 # 07 Y:2007 07 2007 INSULATE BARE EQUIPMENT $5,016 $1,000 Not Implemented
TT0003 # 09 Y:2007 09 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,592 $2,250 Not Implemented
MI0087 # 05 Y:2004 05 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,075 $40 Not Implemented
MI0087 # 02 Y:2004 02 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,417 $223 Not Implemented
MI0087 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,721 $590 Not Implemented
MI0087 # 03 Y:2004 03 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,760 $300 Not Implemented
MI0087 # 04 Y:2004 04 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $18,320 $14,068 Not Implemented
GT0743 # 02 Y:2002 02 2002 OPERATE BOILERS ON HIGH FIRE SETTING $5,598 $0 Not Implemented
GT0743 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $671 $0 Not Implemented
GT0743 # 06 Y:2002 06 2002 RECOVER WASTE HEAT FROM EQUIPMENT $2,792 $5,050 Not Implemented
GT0743 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,206 $17,240 Not Implemented
GT0743 # 08 Y:2002 08 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,666 $0 Not Implemented
GT0743 # 05 Y:2002 05 2002 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $78,433 $112,650 Not Implemented
GT0743 # 01 Y:2002 01 2002 USE MINIMUM STEAM OPERATING PRESSURE $1,259 $0 Implemented
GT0743 # 04 Y:2002 04 2002 USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER $10,781 $1,720 Implemented
NC0225 # 04 Y:2001 04 2001 ELIMINATE COMBUSTIBLE GAS IN FLUE GAS $15,365 $5,000 Implemented