IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

642

matching recommendations
Reset
SIC 228 Yarn And Thread Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0603 # 07 Y:2017 07 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $64,413 $100,000 Not Implemented
NC0603 # 08 Y:2017 08 2017 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $19,341 $30,000 Implemented
NC0540 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,312 $100 Implemented
NC0540 # 02 Y:2015 02 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $2,496 $659 Implemented
NC0540 # 03 Y:2015 03 2015 REPAIR AND ELIMINATE STEAM LEAKS $1,065 $200 Implemented
NC0540 # 04 Y:2015 04 2015 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,539 $1,500 Not Implemented
NC0540 # 05 Y:2015 05 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $12,295 $9,000 Implemented
NC0540 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,087 $19,400 Not Implemented
NC0540 # 07 Y:2015 07 2015 INSTALL OCCUPANCY SENSORS $2,592 $1,388 Not Implemented
NC0540 # 08 Y:2015 08 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $113 $120 Not Implemented
NC0540 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $588 $160 Implemented
NC0540 # 10 Y:2015 10 2015 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $6,804 $22,500 Implemented
NC0540 # 11 Y:2015 11 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $248 $1,000 Not Implemented
NC0540 # 12 Y:2015 12 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,592 $67,363 Implemented
MZ0082 # 07 Y:2012 07 2012 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $0 $0 Not Implemented
MZ0082 # 06 Y:2012 06 2012 ADD AREA LIGHTING SWITCHES $2,446 $800 Not Implemented
MZ0082 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $801 $2,000 Not Implemented
MZ0082 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,870 $850 Implemented
MZ0082 # 03 Y:2012 03 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $384 $1,160 Not Implemented
MZ0082 # 02 Y:2012 02 2012 OPTIMIZE PLANT POWER FACTOR $18,500 $17,720 Implemented
MZ0082 # 01 Y:2012 01 2012 INSTALL OCCUPANCY SENSORS $730 $230 Not Implemented
UA0066 # 10 Y:2011 10 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,963 $3,900 Implemented
UA0066 # 09 Y:2011 09 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $3,013 $1,266 Not Implemented
UA0066 # 08 Y:2011 08 2011 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $26,728 $64,000 Not Implemented
UA0066 # 07 Y:2011 07 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $100,439 $14,349 Not Implemented