IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

902

matching recommendations
Reset
SIC 229 Miscellaneous Textile Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2419 # 02 Y:2024 02 2024 USE OTHER WASTE CONCENTRATION METHODS $50,241 $154,466 n/a
LS2419 # 01 Y:2024 01 2024 IMPROVE SPACE COMFORT CONDITIONING $6,299 $17,640 n/a
LS2419 # 04 Y:2024 04 2024 UPGRADE OBSOLETE EQUIPMENT $56,850 $580,000 n/a
LS2419 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,609 $51,689 n/a
LS2419 # 05 Y:2024 05 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $38,616 $514,800 n/a
UD1085 # 06 Y:2024 06 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $58,447 $0 n/a
UD1085 # 07 Y:2024 07 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,159 $20,475 n/a
UD1085 # 08 Y:2024 08 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,403 $20,475 n/a
UD1085 # 09 Y:2024 09 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,175 $3,294 n/a
UD1085 # 05 Y:2024 05 2024 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,170 $760 n/a
UD1085 # 04 Y:2024 04 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $168 $52 n/a
UD1085 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,525 $0 n/a
UD1085 # 02 Y:2024 02 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $7,415 $0 n/a
UD1085 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,452 $1,235 n/a
CI0030 # 02 Y:2024 02 2024 REPAIR OR REPLACE STEAM TRAPS $15,868 $1,600 n/a
CI0030 # 09 Y:2024 09 2024 RECOVER WASTE HEAT FROM EQUIPMENT $2,030 $5,000 n/a
CI0030 # 03 Y:2024 03 2024 INSTALL OCCUPANCY SENSORS $8,384 $3,000 n/a
CI0030 # 05 Y:2024 05 2024 INSULATE BARE EQUIPMENT $4,265 $2,565 n/a
CI0030 # 04 Y:2024 04 2024 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $4,601 $18,900 n/a
CI0030 # 08 Y:2024 08 2024 REPAIR AND ELIMINATE STEAM LEAKS $2,431 $4,000 n/a
CI0030 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $21,581 $101,332 n/a
CI0030 # 06 Y:2024 06 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,914 $1,600 n/a
CI0030 # 07 Y:2024 07 2024 USE PHOTOCELL CONTROLS $3,830 $1,500 n/a
SU0530 # 07 Y:2023 07 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $4,126 $28,596 Not Implemented
SU0530 # 05 Y:2023 05 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,131 $8,940 Not Implemented