Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
44
matching recommendationsSIC | 229 | Miscellaneous Textile Goods |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0671 # 05 Y:2011 | 05 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $740 | $200 | Implemented |
MA0671 # 01 Y:2011 | 01 | 2011 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $36,635 | $200,000 | Not Implemented |
MA0671 # 03 Y:2011 | 03 | 2011 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $1,556 | $15,000 | Not Implemented |
MA0671 # 04 Y:2011 | 04 | 2011 | INSTALL OCCUPANCY SENSORS | $1,328 | $2,220 | Not Implemented |
MA0671 # 02 Y:2011 | 02 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,780 | $3,550 | Implemented |
MA0641 # 03 Y:2008 | 03 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,028 | $3,000 | Implemented |
MA0641 # 02 Y:2008 | 02 | 2008 | REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE | $3,484 | $3,300 | Not Implemented |
MA0641 # 01 Y:2008 | 01 | 2008 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $280,575 | $3,040,000 | Not Implemented |
MA0599 # 09 Y:2006 | 09 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $627 | $600 | Implemented |
MA0599 # 08 Y:2006 | 08 | 2006 | REDUCE FLUID FLOW RATES | $2,270 | $600 | Implemented |
MA0599 # 07 Y:2006 | 07 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,051 | $7,865 | Implemented |
MA0599 # 06 Y:2006 | 06 | 2006 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $4,260 | $1,190 | Not Implemented |
MA0599 # 01 Y:2006 | 01 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $89,422 | $172,300 | Not Implemented |
MA0599 # 02 Y:2006 | 02 | 2006 | INSULATE BARE EQUIPMENT | $20,495 | $3,700 | Not Implemented |
MA0599 # 03 Y:2006 | 03 | 2006 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $17,205 | $10,250 | Implemented |
MA0599 # 04 Y:2006 | 04 | 2006 | INSULATE BARE EQUIPMENT | $10,010 | $5,280 | Implemented |
MA0599 # 05 Y:2006 | 05 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,780 | $12,325 | Implemented |
MA0571 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,977 | $25,856 | Implemented |
MA0571 # 01 Y:2005 | 01 | 2005 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $97,224 | $319,500 | Not Implemented |
MA0571 # 07 Y:2005 | 07 | 2005 | OPTIMIZE PLANT POWER FACTOR | $735 | $1,450 | Not Implemented |
MA0571 # 06 Y:2005 | 06 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,702 | $1,962 | Not Implemented |
MA0571 # 05 Y:2005 | 05 | 2005 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $6,826 | $29,170 | Implemented |
MA0571 # 04 Y:2005 | 04 | 2005 | USE MINIMUM SAFE OVEN VENTILATION | $7,370 | $1,900 | Implemented |
MA0571 # 02 Y:2005 | 02 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $46,372 | $49,355 | Implemented |
MA0569 # 02 Y:2005 | 02 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,234 | $7,312 | Implemented |