Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
77
matching recommendationsSIC | 229 | Miscellaneous Textile Goods |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0589 # 08 Y:2017 | 08 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,155 | $66,186 | Implemented |
NC0589 # 07 Y:2017 | 07 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,357 | $1,000 | Implemented |
NC0589 # 06 Y:2017 | 06 | 2017 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,876 | $840 | Implemented |
NC0589 # 05 Y:2017 | 05 | 2017 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $11,593 | $10,750 | Not Implemented |
NC0589 # 04 Y:2017 | 04 | 2017 | IMPROVE SPACE COMFORT CONDITIONING | $28,966 | $135,750 | Not Implemented |
NC0589 # 10 Y:2017 | 10 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,050 | $100 | Implemented |
NC0589 # 03 Y:2017 | 03 | 2017 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $4,455 | $10,000 | Not Implemented |
NC0589 # 09 Y:2017 | 09 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $541 | $300 | Implemented |
NC0589 # 02 Y:2017 | 02 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,080 | $19,100 | Not Implemented |
NC0589 # 01 Y:2017 | 01 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $38,378 | $62,575 | Not Implemented |
NC0576 # 03 Y:2016 | 03 | 2016 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $198,172 | $1,100,000 | Not Implemented |
NC0576 # 01 Y:2016 | 01 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $16,790 | $3,000 | Implemented |
NC0576 # 04 Y:2016 | 04 | 2016 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $60,776 | $250,000 | Not Implemented |
NC0576 # 02 Y:2016 | 02 | 2016 | REPAIR OR REPLACE STEAM TRAPS | $108,434 | $80,000 | Implemented |
NC0407 # 02 Y:2010 | 02 | 2010 | USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION | $35,567 | $200,000 | Not Implemented |
NC0407 # 06 Y:2010 | 06 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,776 | $6,897 | Implemented |
NC0407 # 05 Y:2010 | 05 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $350 | $50 | Not Implemented |
NC0407 # 04 Y:2010 | 04 | 2010 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $10,147 | $42,000 | Implemented |
NC0407 # 03 Y:2010 | 03 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,606 | $1,000 | Implemented |
NC0407 # 01 Y:2010 | 01 | 2010 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $13,128 | $60,000 | Implemented |
NC0267 # 04 Y:2003 | 04 | 2003 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,686 | $700 | Implemented |
NC0267 # 05 Y:2003 | 05 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,004 | $12,000 | Implemented |
NC0267 # 07 Y:2003 | 07 | 2003 | RECOVER AND REUSE COOLING WATER | $64,159 | $0 | Not Implemented |
NC0267 # 01 Y:2003 | 01 | 2003 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $869 | $0 | Not Implemented |
NC0267 # 02 Y:2003 | 02 | 2003 | USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING | $6,222 | $9,225 | Not Implemented |