IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

77

matching recommendations
Reset
SIC 229 Miscellaneous Textile Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0589 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,155 $66,186 Implemented
NC0589 # 07 Y:2017 07 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,357 $1,000 Implemented
NC0589 # 06 Y:2017 06 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $3,876 $840 Implemented
NC0589 # 05 Y:2017 05 2017 DISTILL CONTAMINATED SOLVENTS FOR REUSE $11,593 $10,750 Not Implemented
NC0589 # 04 Y:2017 04 2017 IMPROVE SPACE COMFORT CONDITIONING $28,966 $135,750 Not Implemented
NC0589 # 10 Y:2017 10 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,050 $100 Implemented
NC0589 # 03 Y:2017 03 2017 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $4,455 $10,000 Not Implemented
NC0589 # 09 Y:2017 09 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $541 $300 Implemented
NC0589 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,080 $19,100 Not Implemented
NC0589 # 01 Y:2017 01 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $38,378 $62,575 Not Implemented
NC0576 # 03 Y:2016 03 2016 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $198,172 $1,100,000 Not Implemented
NC0576 # 01 Y:2016 01 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $16,790 $3,000 Implemented
NC0576 # 04 Y:2016 04 2016 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $60,776 $250,000 Not Implemented
NC0576 # 02 Y:2016 02 2016 REPAIR OR REPLACE STEAM TRAPS $108,434 $80,000 Implemented
NC0407 # 02 Y:2010 02 2010 USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION $35,567 $200,000 Not Implemented
NC0407 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,776 $6,897 Implemented
NC0407 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $350 $50 Not Implemented
NC0407 # 04 Y:2010 04 2010 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $10,147 $42,000 Implemented
NC0407 # 03 Y:2010 03 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,606 $1,000 Implemented
NC0407 # 01 Y:2010 01 2010 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $13,128 $60,000 Implemented
NC0267 # 04 Y:2003 04 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,686 $700 Implemented
NC0267 # 05 Y:2003 05 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,004 $12,000 Implemented
NC0267 # 07 Y:2003 07 2003 RECOVER AND REUSE COOLING WATER $64,159 $0 Not Implemented
NC0267 # 01 Y:2003 01 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $869 $0 Not Implemented
NC0267 # 02 Y:2003 02 2003 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $6,222 $9,225 Not Implemented