IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

260

matching recommendations
Reset
SIC 2295 Coated Fabrics, Not Rubberized
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0216 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $14,507 $20,000 Implemented
TT0216 # 05 Y:2019 05 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $1,220 $20 Implemented
TT0216 # 07 Y:2019 07 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $386 $1,530 Implemented
TT0216 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,494 $3,750 Implemented
TT0216 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,054 $3,559 Implemented
TT0216 # 04 Y:2019 04 2019 INSTALL / REPAIR INSULATION ON STEAM LINES $1,254 $1,710 Implemented
TT0216 # 01 Y:2019 01 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $21,451 $2,000 Not Implemented
LE0457 # 04 Y:2018 04 2018 REPLACE BOILER $33,772 $150,000 Not Implemented
LE0457 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,554 $25,157 Implemented
LE0457 # 02 Y:2018 02 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $619 $2,200 Not Implemented
LE0457 # 06 Y:2018 06 2018 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,457 $36,000 Implemented
LE0457 # 05 Y:2018 05 2018 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,689 $13,000 Implemented
LE0457 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,771 $10,041 Implemented
TT0199 # 03 Y:2017 03 2017 OPTIMIZE PLANT POWER FACTOR $5,729 $8,000 Not Implemented
TT0199 # 05 Y:2017 05 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,715 $11,600 Not Implemented
TT0199 # 04 Y:2017 04 2017 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,003 $25 Not Implemented
TT0199 # 02 Y:2017 02 2017 REPAIR OR REPLACE STEAM TRAPS $14,682 $4,830 Not Implemented
TT0199 # 01 Y:2017 01 2017 CLEAN FOULING FROM WATER LINES REGULARLY $91,197 $8,500 Not Implemented
NC0589 # 10 Y:2017 10 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,050 $100 Implemented
NC0589 # 01 Y:2017 01 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $38,378 $62,575 Not Implemented
NC0589 # 05 Y:2017 05 2017 DISTILL CONTAMINATED SOLVENTS FOR REUSE $11,593 $10,750 Not Implemented
NC0589 # 04 Y:2017 04 2017 IMPROVE SPACE COMFORT CONDITIONING $28,966 $135,750 Not Implemented
NC0589 # 06 Y:2017 06 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $3,876 $840 Implemented
NC0589 # 07 Y:2017 07 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,357 $1,000 Implemented
NC0589 # 03 Y:2017 03 2017 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $4,455 $10,000 Not Implemented