IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,196

matching recommendations
Reset
SIC 23 Apparel And Other Textile Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0126 # 03 Y:1984 03 1984 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,630 $0 Implemented
KU0126 # 02 Y:1984 02 1984 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $1,038 $0 Implemented
KU0126 # 04 Y:1984 04 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $219 $0 Implemented
KU0126 # 06 Y:1984 06 1984 INSTALL TIMERS AND/OR THERMOSTATS $369 $0 Implemented
KU0126 # 08 Y:1984 08 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $184 $140 Implemented
KU0126 # 09 Y:1984 09 1984 REPAIR AND ELIMINATE STEAM LEAKS $196 $150 Implemented
KU0126 # 11 Y:1984 11 1984 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $59 $40 Implemented
TN0201 # 01 Y:1984 01 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,160 $10 Implemented
TN0201 # 02 Y:1984 02 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,336 $2,325 Implemented
TN0201 # 04 Y:1984 04 1984 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $94 $45 Implemented
KU0122 # 02 Y:1984 02 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,060 $5,000 Implemented
KU0122 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,649 $3,690 Implemented
KU0122 # 04 Y:1984 04 1984 INSTALL TIMERS AND/OR THERMOSTATS $3,254 $450 Implemented
KU0122 # 05 Y:1984 05 1984 KEEP BOILER TUBES CLEAN $1,926 $2,000 Implemented
KU0122 # 07 Y:1984 07 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,439 $1,985 Implemented
KU0122 # 08 Y:1984 08 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $423 $0 Implemented
KU0122 # 09 Y:1984 09 1984 INSTALL SET-BACK TIMERS $401 $50 Implemented
KU0122 # 10 Y:1984 10 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $272 $280 Implemented
KU0122 # 11 Y:1984 11 1984 INSTALL TIMERS AND/OR THERMOSTATS $211 $300 Implemented
KU0122 # 12 Y:1984 12 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $169 $0 Implemented
KU0116 # 03 Y:1984 03 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,138 $0 Implemented
KU0116 # 04 Y:1984 04 1984 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,182 $100 Implemented
KU0116 # 06 Y:1984 06 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,515 $230 Implemented
KU0116 # 11 Y:1984 11 1984 INSULATE BARE EQUIPMENT $316 $60 Implemented
OK0103 # 04 Y:1983 04 1983 INSTALL SET-BACK TIMERS $153 $333 Implemented