IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
SIC 23 Apparel And Other Textile Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0588 # 03 Y:2022 03 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $621 $1,515 Implemented
SF0588 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,344 $4,967 Implemented
SF0588 # 01 Y:2022 01 2022 INSULATE BARE EQUIPMENT $8,477 $5,558 Implemented
SF0562 # 07 Y:2020 07 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $26,796 $86,835 Implemented
SF0562 # 06 Y:2020 06 2020 RECOVER WASTE HEAT FROM EQUIPMENT $12,365 $55,965 Implemented
SF0562 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,226 $2,592 Implemented
SF0562 # 01 Y:2020 01 2020 INSULATE BARE EQUIPMENT $1,259 $918 Implemented
SF0497 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,014 $0 Implemented
SF0497 # 04 Y:2017 04 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $573 $425 Implemented
SF0497 # 03 Y:2017 03 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,873 $0 Implemented
SF0456 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,511 $18,537 Implemented
SF0456 # 05 Y:2014 05 2014 INSULATE BARE EQUIPMENT $502 $638 Implemented
SF0456 # 04 Y:2014 04 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $114 $127 Implemented
SF0456 # 03 Y:2014 03 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $883 $327 Implemented
SF0456 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,324 $80 Implemented
SF0456 # 01 Y:2014 01 2014 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $8,140 $0 Implemented
SD0244 # 04 Y:2000 04 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $977 $0 Implemented
SD0244 # 05 Y:2000 05 2000 INSTALL EQUIPMENT TO MOVE PRODUCT $136,408 $57,000 Implemented
SD0241 # 06 Y:2000 06 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $274 $0 Implemented
SD0241 # 04 Y:2000 04 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,802 $0 Implemented
SD0241 # 03 Y:2000 03 2000 REDUCE EXCESSIVE BOILER BLOWDOWN $2,831 $6,150 Implemented
SD0241 # 01 Y:2000 01 2000 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $9,946 $24,320 Implemented
SD0193 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,848 $2,848 Implemented
SD0193 # 05 Y:1998 05 1998 INSTALL SPECTRAL REFLECTORS / DELAMP $1,914 $3,160 Implemented
SD0193 # 06 Y:1998 06 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $10,800 $5,000 Implemented