IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

57

matching recommendations
Reset
SIC 2389 Apparel And Accessories, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0211 # 01 Y:2023 01 2023 REPLACE BOILER $24,600 $111,300 Implemented
UU0211 # 04 Y:2023 04 2023 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $3,351 $26,250 Implemented
DL0199 # 01 Y:2021 01 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,226 $0 Implemented
DL0199 # 02 Y:2021 02 2021 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,784 $0 Implemented
DL0199 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN WATER LINES AND VALVES $2,657 $1,514 Implemented
DL0199 # 13 Y:2021 13 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,579 $2,106 Implemented
UU0171 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,969 $4,000 Implemented
UU0171 # 01 Y:2020 01 2020 ELIMINATE/REDUCE AN OPERATION $43,211 $85,000 Implemented
NC0642 # 04 Y:2019 04 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $16,383 $500 Implemented
LE0480 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $418 $35 Implemented
LE0480 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,546 $107,988 Implemented
DL0131 # 09 Y:2014 09 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,970 $700 Implemented
UA0067 # 02 Y:2011 02 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,859 $480 Implemented
UA0067 # 01 Y:2011 01 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $7,432 $120 Implemented
UA0067 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $726 $1,100 Implemented
UM0255 # 02 Y:2004 02 2004 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $6,279 $2,497 Implemented
UM0255 # 01 Y:2004 01 2004 INSULATE BARE EQUIPMENT $10,323 $6,486 Implemented
UM0255 # 04 Y:2004 04 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,618 $2,500 Implemented
UM0157 # 05 Y:2000 05 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,296 $738 Implemented
UM0157 # 03 Y:2000 03 2000 REDUCE EXCESSIVE BOILER BLOWDOWN $1,224 $4,430 Implemented
UM0157 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,161 $150 Implemented
UM0157 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $746 $500 Implemented
NC0137 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,470 $325 Implemented
NC0137 # 06 Y:1998 06 1998 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $1,035 $4,000 Implemented
NC0137 # 07 Y:1998 07 1998 EXPAND OPERATIONS INTO UNUSED SPACE $104,500 $168,500 Implemented