Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
57
matching recommendationsSIC | 2389 | Apparel And Accessories, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0211 # 01 Y:2023 | 01 | 2023 | REPLACE BOILER | $24,600 | $111,300 | Implemented |
UU0211 # 04 Y:2023 | 04 | 2023 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $3,351 | $26,250 | Implemented |
DL0199 # 01 Y:2021 | 01 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,226 | $0 | Implemented |
DL0199 # 02 Y:2021 | 02 | 2021 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $1,784 | $0 | Implemented |
DL0199 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $2,657 | $1,514 | Implemented |
DL0199 # 13 Y:2021 | 13 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,579 | $2,106 | Implemented |
UU0171 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,969 | $4,000 | Implemented |
UU0171 # 01 Y:2020 | 01 | 2020 | ELIMINATE/REDUCE AN OPERATION | $43,211 | $85,000 | Implemented |
NC0642 # 04 Y:2019 | 04 | 2019 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $16,383 | $500 | Implemented |
LE0480 # 01 Y:2019 | 01 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $418 | $35 | Implemented |
LE0480 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,546 | $107,988 | Implemented |
DL0131 # 09 Y:2014 | 09 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,970 | $700 | Implemented |
UA0067 # 02 Y:2011 | 02 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,859 | $480 | Implemented |
UA0067 # 01 Y:2011 | 01 | 2011 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $7,432 | $120 | Implemented |
UA0067 # 03 Y:2011 | 03 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $726 | $1,100 | Implemented |
UM0255 # 02 Y:2004 | 02 | 2004 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $6,279 | $2,497 | Implemented |
UM0255 # 01 Y:2004 | 01 | 2004 | INSULATE BARE EQUIPMENT | $10,323 | $6,486 | Implemented |
UM0255 # 04 Y:2004 | 04 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,618 | $2,500 | Implemented |
UM0157 # 05 Y:2000 | 05 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $1,296 | $738 | Implemented |
UM0157 # 03 Y:2000 | 03 | 2000 | REDUCE EXCESSIVE BOILER BLOWDOWN | $1,224 | $4,430 | Implemented |
UM0157 # 01 Y:2000 | 01 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,161 | $150 | Implemented |
UM0157 # 02 Y:2000 | 02 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $746 | $500 | Implemented |
NC0137 # 03 Y:1998 | 03 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,470 | $325 | Implemented |
NC0137 # 06 Y:1998 | 06 | 1998 | USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS | $1,035 | $4,000 | Implemented |
NC0137 # 07 Y:1998 | 07 | 1998 | EXPAND OPERATIONS INTO UNUSED SPACE | $104,500 | $168,500 | Implemented |