Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
46
matching recommendationsSIC | 2392 | Housefurnishings, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0492 # 07 Y:2013 | 07 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $60 | $90 | Not Implemented |
NC0492 # 06 Y:2013 | 06 | 2013 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $20,838 | $12,000 | Not Implemented |
NC0492 # 05 Y:2013 | 05 | 2013 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $688 | $0 | Implemented |
NC0492 # 04 Y:2013 | 04 | 2013 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,869 | $100 | Not Implemented |
NC0492 # 03 Y:2013 | 03 | 2013 | USE PHOTOCELL CONTROLS | $259 | $250 | Not Implemented |
NC0492 # 02 Y:2013 | 02 | 2013 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,492 | $1,140 | Implemented |
NC0492 # 01 Y:2013 | 01 | 2013 | INSTALL OCCUPANCY SENSORS | $8,471 | $13,495 | Not Implemented |
NC0304 # 02 Y:2004 | 02 | 2004 | FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM | $27,494 | $13,050 | Implemented |
NC0304 # 01 Y:2004 | 01 | 2004 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $25,824 | $24,000 | n/a |
NC0304 # 03 Y:2004 | 03 | 2004 | ADJUST BURNERS FOR EFFICIENT OPERATION | $20,008 | $3,000 | Implemented |
NC0304 # 04 Y:2004 | 04 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,821 | $400 | Implemented |
NC0304 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,732 | $100 | Implemented |
NC0304 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,024 | $4,207 | Not Implemented |
NC0230 # 09 Y:2002 | 09 | 2002 | LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE | $4,254 | $3,500 | Implemented |
NC0230 # 08 Y:2002 | 08 | 2002 | USE RADIANT HEATER FOR SPOT HEATING | $263 | $0 | Not Implemented |
NC0230 # 07 Y:2002 | 07 | 2002 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $645 | $1,100 | Not Implemented |
NC0230 # 06 Y:2002 | 06 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $797 | $1,040 | Implemented |
NC0230 # 05 Y:2002 | 05 | 2002 | ADD AREA LIGHTING SWITCHES | $1,053 | $3,340 | Implemented |
NC0230 # 04 Y:2002 | 04 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,301 | $2,500 | Not Implemented |
NC0230 # 03 Y:2002 | 03 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $893 | $500 | Implemented |
NC0230 # 02 Y:2002 | 02 | 2002 | DEVELOP A REPAIR/REPLACE POLICY | $1,099 | $1,354 | Implemented |
NC0230 # 01 Y:2002 | 01 | 2002 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $22,396 | $5,000 | Not Implemented |
GT0724 # 02 Y:2001 | 02 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,554 | $0 | Not Implemented |
GT0724 # 06 Y:2001 | 06 | 2001 | USE OPTIMUM TEMPERATURE | $45,009 | $3,850 | Not Implemented |
GT0724 # 05 Y:2001 | 05 | 2001 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $6,956 | $7,500 | Implemented |