IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

46

matching recommendations
Reset
SIC 2392 Housefurnishings, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0492 # 01 Y:2013 01 2013 INSTALL OCCUPANCY SENSORS $8,471 $13,495 Not Implemented
NC0492 # 02 Y:2013 02 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,492 $1,140 Implemented
NC0492 # 03 Y:2013 03 2013 USE PHOTOCELL CONTROLS $259 $250 Not Implemented
NC0492 # 04 Y:2013 04 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,869 $100 Not Implemented
NC0492 # 05 Y:2013 05 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $688 $0 Implemented
NC0492 # 07 Y:2013 07 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $60 $90 Not Implemented
NC0492 # 06 Y:2013 06 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $20,838 $12,000 Not Implemented
NC0304 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,732 $100 Implemented
NC0304 # 03 Y:2004 03 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $20,008 $3,000 Implemented
NC0304 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,821 $400 Implemented
NC0304 # 01 Y:2004 01 2004 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $25,824 $24,000 n/a
NC0304 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,024 $4,207 Not Implemented
NC0304 # 02 Y:2004 02 2004 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $27,494 $13,050 Implemented
NC0230 # 08 Y:2002 08 2002 USE RADIANT HEATER FOR SPOT HEATING $263 $0 Not Implemented
NC0230 # 02 Y:2002 02 2002 DEVELOP A REPAIR/REPLACE POLICY $1,099 $1,354 Implemented
NC0230 # 01 Y:2002 01 2002 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $22,396 $5,000 Not Implemented
NC0230 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $893 $500 Implemented
NC0230 # 07 Y:2002 07 2002 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $645 $1,100 Not Implemented
NC0230 # 09 Y:2002 09 2002 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $4,254 $3,500 Implemented
NC0230 # 04 Y:2002 04 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,301 $2,500 Not Implemented
NC0230 # 06 Y:2002 06 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $797 $1,040 Implemented
NC0230 # 05 Y:2002 05 2002 ADD AREA LIGHTING SWITCHES $1,053 $3,340 Implemented
GT0724 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,554 $0 Not Implemented
GT0724 # 05 Y:2001 05 2001 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $6,956 $7,500 Implemented
GT0724 # 06 Y:2001 06 2001 USE OPTIMUM TEMPERATURE $45,009 $3,850 Not Implemented