IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

147

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0264 # 03 Y:2022 03 2022 RECOVER WASTE HEAT FROM EQUIPMENT $9,549 $8,397 Implemented
UA0264 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,878 $500 Implemented
UA0264 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,563 $1,200 Implemented
UA0264 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,745 $4,870 Implemented
UA0263 # 07 Y:2022 07 2022 INSTALL OCCUPANCY SENSORS $3,323 $3,005 Implemented
UA0263 # 06 Y:2022 06 2022 INSTALL TIMERS AND/OR THERMOSTATS $12,543 $6,630 Implemented
UA0263 # 09 Y:2022 09 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,119 $5,072 Implemented
UA0263 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $47,564 $3,635 Implemented
UA0263 # 02 Y:2022 02 2022 OPTIMIZE PLANT POWER FACTOR $75,936 $24,406 Implemented
UA0263 # 08 Y:2022 08 2022 USE PHOTOCELL CONTROLS $1,182 $2,240 Implemented
UA0260 # 05 Y:2022 05 2022 OPTIMIZE PLANT POWER FACTOR $90,617 $35,347 Implemented
UA0260 # 02 Y:2022 02 2022 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $3,710 $1,651 Implemented
UA0230 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,204 $50 Implemented
UA0230 # 04 Y:2020 04 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $229 $50 Implemented
UA0230 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,808 $1,868 Implemented
UA0226 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,733 $50 Implemented
UA0226 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,464 $2,170 Implemented
UA0226 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,164 $309 Implemented
UA0225 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,563 $12,609 Implemented
UA0225 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,691 $50 Implemented
UA0225 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,568 $8,775 Implemented
UA0223 # 01 Y:2020 01 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $965 $562 Implemented
UA0223 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,828 $1,395 Implemented
UA0211 # 08 Y:2019 08 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $26,196 $150 Implemented
UA0211 # 07 Y:2019 07 2019 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $374,108 $1,310,277 Implemented