IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,223

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0548 # 01 Y:2004 01 2004 REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER $16,080 $1,150 Implemented
CO0548 # 02 Y:2004 02 2004 DISTILL CONTAMINATED SOLVENTS FOR REUSE $14,440 $12,420 Implemented
CO0548 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,940 $360 Implemented
CO0548 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,330 $60 Implemented
CO0548 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $130 $340 Not Implemented
CO0548 # 06 Y:2004 06 2004 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $960 $500 Implemented
CO0548 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $136 $70 Implemented
AS0381 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,696 $45 Implemented
AS0381 # 02 Y:2004 02 2004 USE SOLAR HEAT TO HEAT WATER $6,129 $24,120 Not Implemented
AS0381 # 03 Y:2004 03 2004 INSULATE BARE EQUIPMENT $1,197 $468 Not Implemented
AS0381 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $16,379 $74,008 Implemented
AS0381 # 05 Y:2004 05 2004 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $396 $30 Implemented
AS0381 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $738 $30 Implemented
AS0381 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,583 $6,928 Not Implemented
UF0343 # 01 Y:2004 01 2004 REPAIR AND ELIMINATE STEAM LEAKS $10,952 $225 Implemented
UF0343 # 02 Y:2004 02 2004 INSULATE FEEDWATER TANK $1,477 $1,828 Not Implemented
UF0343 # 03 Y:2004 03 2004 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,420 $0 Implemented
UF0343 # 04 Y:2004 04 2004 REPAIR AND ELIMINATE STEAM LEAKS $4,592 $1,706 Implemented
UF0343 # 05 Y:2004 05 2004 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $172,708 $330,000 Implemented
UF0343 # 06 Y:2004 06 2004 INSTALL BACK-UP EQUIPMENT $26,182 $64,000 Implemented
UF0343 # 07 Y:2004 07 2004 INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM $59,280 $260,000 Not Implemented
UF0343 # 08 Y:2004 08 2004 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $13,200 $12,000 Implemented
UF0343 # 09 Y:2004 09 2004 APPLY FOR INVESTMENT INCENTIVES $5,053 $60 Implemented
OR0456 # 01 Y:2004 01 2004 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $-1,300 $5,000 Not Implemented
OR0456 # 02 Y:2004 02 2004 KEEP BOILER TUBES CLEAN $37,240 $1,760 Not Implemented