IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,197

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0250 # 11 Y:2004 11 2004 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $3,873 $640 Not Implemented
BD0250 # 12 Y:2004 12 2004 MINIMIZE WATER USAGE $1,076 $690 Implemented
AS0366 # 01 Y:2004 01 2004 $66,315 $18,116 Not Implemented
AS0366 # 02 Y:2004 02 2004 $11,700 $18,000 Not Implemented
AS0366 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,140 $60 Implemented
AS0366 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,660 $7,180 Not Implemented
AS0366 # 05 Y:2004 05 2004 $1,275 $573 Implemented
AS0366 # 06 Y:2004 06 2004 USE SOLAR HEAT TO HEAT WATER $468 $1,730 Not Implemented
AS0366 # 07 Y:2004 07 2004 CONVERT LIQUID HEATERS FROM UNDERFIRING TO IMMERSION OR SUBMERSION HEATING $468 $1,150 Not Implemented
AS0366 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $353 $1,640 Implemented
OR0447 # 01 Y:2003 01 2003 $105,200 $7,000 Implemented
OR0447 # 02 Y:2003 02 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $43,500 $4,910 Not Implemented
OR0447 # 03 Y:2003 03 2003 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $28,720 $150 Implemented
OR0447 # 04 Y:2003 04 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $2,460 $880 Implemented
OR0446 # 01 Y:2003 01 2003 $508,000 $28,000 Not Implemented
OR0446 # 02 Y:2003 02 2003 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $9,000 $8,100 Implemented
OR0446 # 03 Y:2003 03 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $21,800 $21,600 Implemented
OR0446 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,100 $13,000 Implemented
OR0446 # 05 Y:2003 05 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $27,050 $98,000 Not Implemented
OR0446 # 06 Y:2003 06 2003 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $6,780 $26,000 Implemented
NC0273 # 01 Y:2003 01 2003 RECOVER WASTE HEAT FROM EQUIPMENT $705 $500 Not Implemented
NC0273 # 02 Y:2003 02 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $232 $83 Implemented
NC0273 # 03 Y:2003 03 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $65 $0 Implemented
NC0273 # 04 Y:2003 04 2003 INSTALL OCCUPANCY SENSORS $51 $104 Not Implemented
NC0273 # 05 Y:2003 05 2003 USE PHOTOCELL CONTROLS $137 $200 Not Implemented