IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,167

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0563 # 02 Y:2010 02 2010 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $219,003 $250,000 Implemented
OR0563 # 03 Y:2010 03 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $46,600 $244,000 Implemented
OR0563 # 04 Y:2010 04 2010 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,100,000 $2,150,000 Not Implemented
OR0562 # 01 Y:2010 01 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $8,447 $2,500 Implemented
OR0562 # 02 Y:2010 02 2010 BURN A LESS EXPENSIVE GRADE OF FUEL $6,592 $14,997 Not Implemented
OR0562 # 03 Y:2010 03 2010 RECOVER WASTE HEAT FROM EQUIPMENT $1,447 $2,724 Implemented
OR0562 # 04 Y:2010 04 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,192 $0 Implemented
OR0555 # 01 Y:2010 01 2010 IMPROVE COMBUSTION CONTROL CAPABILITY $257,883 $405,450 Not Implemented
OR0555 # 02 Y:2010 02 2010 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $32,115 $37,100 Not Implemented
OR0555 # 03 Y:2010 03 2010 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $15,978 $11,900 Implemented
OR0555 # 04 Y:2010 04 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,054 $1 Implemented
OR0554 # 01 Y:2010 01 2010 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $33,705 $0 Implemented
OR0554 # 02 Y:2010 02 2010 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,667 $700 Not Implemented
OR0554 # 03 Y:2010 03 2010 UPGRADE CONTROLS ON COMPRESSORS $13,900 $1,500 Implemented
OR0554 # 04 Y:2010 04 2010 REDUCE FLUID FLOW RATES $6,442 $6,442 Implemented
OR0554 # 05 Y:2010 05 2010 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $6,200 $1,900 Not Implemented
OR0551 # 01 Y:2009 01 2009 UPGRADE CONTROLS ON COMPRESSORS $77,191 $50,820 Implemented
OR0551 # 02 Y:2009 02 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $28,529 $42,146 Implemented
OR0551 # 03 Y:2009 03 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $29,500 $0 Not Implemented
OR0551 # 04 Y:2009 04 2009 INSTALL OCCUPANCY SENSORS $28,320 $48,980 Implemented
OR0551 # 05 Y:2009 05 2009 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $83,890 $100,800 Implemented
OR0549 # 01 Y:2009 01 2009 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $170,135 $100,000 Not Implemented
OR0549 # 02 Y:2009 02 2009 PREHEAT COMBUSTION AIR WITH WASTE HEAT $46,600 $27,000 Not Implemented
OR0549 # 03 Y:2009 03 2009 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $28,000 $700 Not Implemented
OR0549 # 04 Y:2009 04 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,682 $0 Implemented