IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,223

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0167 # 05 Y:1999 05 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,523 $0 Implemented
AR0167 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,567 $200 Implemented
AR0167 # 07 Y:1999 07 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,681 $8,274 Not Implemented
AR0167 # 08 Y:1999 08 1999 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $2,390,400 $4,500,000 Not Implemented
AR0167 # 09 Y:1999 09 1999 INSTALL / REPAIR INSULATION ON STEAM LINES $3,707 $1,791 Implemented
AR0167 # 10 Y:1999 10 1999 USE OPTIMUM THICKNESS INSULATION $86,793 $85,710 Not Implemented
AR0167 # 11 Y:1999 11 1999 AUTOMATE FINISHING PROCESS $80,703 $51,700 Not Implemented
CO0447 # 01 Y:1999 01 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,160 $5,000 Implemented
CO0447 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,270 $660 Implemented
CO0447 # 03 Y:1999 03 1999 REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER $2,250 $1,100 Not Implemented
CO0447 # 04 Y:1999 04 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $170 $0 Not Implemented
CO0447 # 05 Y:1999 05 1999 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $80,060 $200,000 Implemented
CO0447 # 06 Y:1999 06 1999 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $29,130 $30,000 Not Implemented
KU0525 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $860 $1,110 Not Implemented
KU0525 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $480 $800 Not Implemented
KU0525 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $170 $350 Not Implemented
KU0525 # 04 Y:1999 04 1999 AUTOMATE FINISHING PROCESS $14,840 $25,000 Not Implemented
OR0349 # 01 Y:1999 01 1999 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $40,560 $64,125 Implemented
OR0349 # 02 Y:1999 02 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $36,220 $98,500 Not Implemented
OR0349 # 03 Y:1999 03 1999 UPGRADE CONVEYORS $18,725 $46,000 Not Implemented
OR0349 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,088 $10,000 Implemented
OR0349 # 05 Y:1999 05 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,171 $0 Not Implemented
OR0349 # 06 Y:1999 06 1999 UPGRADE CONTROLS ON COMPRESSORS $24,695 $2,840 Implemented
OR0349 # 07 Y:1999 07 1999 INCREASE USE OF AUTOMATION $179,000 $42,000 Not Implemented
ME0271 # 01 Y:1999 01 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,060 $47,675 Implemented