IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,223

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0166 # 02 Y:1999 02 1999 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $5,877 $15,000 Not Implemented
NC0166 # 03 Y:1999 03 1999 USE PHOTOCELL CONTROLS $601 $150 Implemented
NC0166 # 04 Y:1999 04 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,328 $5,000 Not Implemented
NC0166 # 05 Y:1999 05 1999 INSULATE FEEDWATER TANK $328 $340 Implemented
NC0166 # 06 Y:1999 06 1999 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $645 $800 Not Implemented
NC0166 # 07 Y:1999 07 1999 BURN WOOD BY-PRODUCTS FOR HEAT $12,902 $62,200 Not Implemented
NC0166 # 08 Y:1999 08 1999 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $29,365 $82,000 Not Implemented
NC0166 # 09 Y:1999 09 1999 INSTALL EQUIPMENT TO MOVE PRODUCT $14,000 $15,500 Implemented
NC0166 # 10 Y:1999 10 1999 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $7,700 $1,000 Implemented
UL0225 # 01 Y:1999 01 1999 OPTIMIZE PLANT POWER FACTOR $22,666 $14,656 Implemented
UL0225 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $742 $65 Not Implemented
UL0225 # 03 Y:1999 03 1999 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $135,070 $761,380 Not Implemented
UL0225 # 04 Y:1999 04 1999 ADOPT IN-HOUSE MATERIAL GENERATION $136,000 $143,925 Not Implemented
MS0136 # 01 Y:1999 01 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,570 $133 Not Implemented
MS0136 # 02 Y:1999 02 1999 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $561 $334 Not Implemented
MS0136 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,618 $1,130 Not Implemented
MS0136 # 04 Y:1999 04 1999 RECOVER WASTE HEAT FROM EQUIPMENT $1,296 $3,418 Not Implemented
MS0136 # 05 Y:1999 05 1999 INSTALL SET-BACK TIMERS $717 $472 Not Implemented
MS0136 # 06 Y:1999 06 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $279,396 $26,310 Not Implemented
AS0254 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,761 $10,671 Not Implemented
AS0254 # 02 Y:1999 02 1999 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,410 $3,840 Not Implemented
AS0254 # 03 Y:1999 03 1999 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,133 $2,400 Implemented
AS0254 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,330 $840 Implemented
AS0254 # 05 Y:1999 05 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,213 $3,800 Not Implemented
AS0254 # 06 Y:1999 06 1999 RECYCLE WHITE WATER $14,029 $500 Implemented