IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

210

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0481 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,229 $4,819 Not Implemented
NC0481 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $865 $955 Not Implemented
NC0481 # 07 Y:2013 07 2013 INSTALL OCCUPANCY SENSORS $602 $750 Implemented
NC0442 # 01 Y:2012 01 2012 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $9,357 $35,000 Not Implemented
NC0442 # 02 Y:2012 02 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $44,787 $200,000 Not Implemented
NC0442 # 03 Y:2012 03 2012 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $4,788 $20,000 Not Implemented
NC0442 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,196 $4,425 Implemented
NC0442 # 05 Y:2012 05 2012 DEVELOP A REPAIR/REPLACE POLICY $3,045 $6,067 Implemented
NC0442 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,418 $9,330 Implemented
NC0442 # 07 Y:2012 07 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $977 $231 Implemented
NC0442 # 08 Y:2012 08 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,227 $300 Implemented
NC0408 # 01 Y:2010 01 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,189 $1,000 Implemented
NC0408 # 02 Y:2010 02 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $5,644 $1,689 Implemented
NC0408 # 03 Y:2010 03 2010 REPAIR OR REPLACE STEAM TRAPS $5,428 $5,500 Implemented
NC0408 # 04 Y:2010 04 2010 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $712,007 $1,750,000 Implemented
NC0408 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,000 $7,665 Implemented
NC0408 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $27,873 $53,873 Implemented
NC0408 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,195 $2,876 Implemented
NC0408 # 08 Y:2010 08 2010 INSTALL OCCUPANCY SENSORS $882 $924 Implemented
NC0408 # 09 Y:2010 09 2010 OPTIMIZE PLANT POWER FACTOR $11,133 $20,000 Not Implemented
NC0408 # 10 Y:2010 10 2010 DEVELOP A REPAIR/REPLACE POLICY $11,081 $2,538 Implemented
NC0408 # 11 Y:2010 11 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,280 $100 Implemented
NC0318 # 01 Y:2005 01 2005 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $39,375 $1,000 Implemented
NC0318 # 02 Y:2005 02 2005 OPTIMIZE PLANT POWER FACTOR $11,668 $20,000 Implemented
NC0318 # 03 Y:2005 03 2005 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $10,275 $18,500 Not Implemented