IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,223

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0548 # 09 Y:2017 09 2017 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,157 $3,278 Not Implemented
WV0548 # 10 Y:2017 10 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,140 $1,058 Not Implemented
WV0548 # 11 Y:2017 11 2017 DEVELOP A REPAIR/REPLACE POLICY $1,024 $699 Implemented
WV0548 # 12 Y:2017 12 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $863 $431 Implemented
WV0548 # 13 Y:2017 13 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $260 $850 Implemented
NL0004 # 01 Y:2017 01 2017 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $93,000 $125,000 Implemented
NL0004 # 02 Y:2017 02 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $65,107 $300,000 Implemented
NL0004 # 03 Y:2017 03 2017 TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS $30,789 $30,000 Implemented
NL0004 # 04 Y:2017 04 2017 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $6,396 $1,100 Implemented
NL0004 # 05 Y:2017 05 2017 COVER OPEN TANKS $4,000 $5,200 Implemented
NL0004 # 06 Y:2017 06 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $823 $2,300 Implemented
OR0686 # 01 Y:2017 01 2017 DEVELOP STANDARD OPERATING PROCEDURES $181,947 $31,400 Not Implemented
OR0686 # 02 Y:2017 02 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $5,219 $0 Not Implemented
OR0686 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,997 $1,200 Not Implemented
OR0686 # 04 Y:2017 04 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,155 $0 Not Implemented
OR0686 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,115 $16,115 Not Implemented
OR0686 # 06 Y:2017 06 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,743 $500 Not Implemented
TT0189 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,177 $3,050 Implemented
TT0189 # 02 Y:2017 02 2017 UPGRADE CONTROLS ON COMPRESSORS $11,026 $14,000 Not Implemented
TT0189 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,767 $4,837 Implemented
TT0189 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,128 $125 Not Implemented
TT0189 # 05 Y:2017 05 2017 INSULATE BARE EQUIPMENT $864 $2,140 Implemented
TT0189 # 06 Y:2017 06 2017 REDUCE EXCESS STEAM BLEEDING $224 $225 Not Implemented
AM0728 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,680 $20,300 Implemented
AM0728 # 02 Y:2017 02 2017 OPTIMIZE PLANT POWER FACTOR $8,480 $5,420 Implemented