IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,223

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0612 # 03 Y:2008 03 2008 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $160 $450 Implemented
CO0612 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,400 $25,650 Not Implemented
CO0612 # 05 Y:2008 05 2008 INSTALL OCCUPANCY SENSORS $5,270 $10,430 Not Implemented
CO0612 # 06 Y:2008 06 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,930 $15,400 Not Implemented
CO0612 # 07 Y:2008 07 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,430 $960 Not Implemented
OR0528 # 01 Y:2008 01 2008 ELIMINATE A BY-PRODUCT $527,900 $300,000 Not Implemented
OR0528 # 02 Y:2008 02 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $46,200 $34,030 Not Implemented
OR0528 # 03 Y:2008 03 2008 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $20,500 $24,910 Not Implemented
OR0528 # 04 Y:2008 04 2008 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $64,651 $0 Not Implemented
OR0528 # 05 Y:2008 05 2008 RECOVER WASTE HEAT FROM EQUIPMENT $10,800 $16,950 Not Implemented
OR0528 # 06 Y:2008 06 2008 INSULATE BARE EQUIPMENT $1,850 $380 Not Implemented
OR0528 # 07 Y:2008 07 2008 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $287,980 $314,400 Not Implemented
SF0366 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,775 $0 Implemented
SF0366 # 02 Y:2008 02 2008 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,455 $452 Not Implemented
SF0366 # 03 Y:2008 03 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,202 $1,339 Implemented
SF0366 # 04 Y:2008 04 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $176 $93 Implemented
SF0366 # 05 Y:2008 05 2008 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,839 $2,119 Not Implemented
SF0366 # 06 Y:2008 06 2008 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,476 $2,404 Implemented
SF0366 # 07 Y:2008 07 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,134 $4,709 Not Implemented
SF0366 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $853 $2,892 Not Implemented
SF0366 # 09 Y:2008 09 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $276 $953 Implemented
AM0538 # 01 Y:2008 01 2008 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $192,300 $174,034 Not Implemented
AM0538 # 02 Y:2008 02 2008 REPAIR AND ELIMINATE STEAM LEAKS $171,000 $5,000 Implemented
AM0538 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,905 $105,000 Implemented
AM0538 # 04 Y:2008 04 2008 REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT $2,200,000 $6,600,000 Implemented