IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

289

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0631 # 04 Y:2001 04 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,478 $6,067 Implemented
OK0631 # 03 Y:2001 03 2001 ADD AREA LIGHTING SWITCHES $1,991 $194 Implemented
OK0631 # 02 Y:2001 02 2001 INSULATE BARE EQUIPMENT $13,831 $8,000 Implemented
OK0631 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,487 $400 Implemented
OK0631 # 05 Y:2001 05 2001 INSTALL EQUIPMENT TO MOVE PRODUCT $174,720 $364,000 Implemented
OR0405 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,599 $4,500 Implemented
OR0405 # 06 Y:2001 06 2001 UPGRADE CONTROLS ON COMPRESSORS $13,877 $4,000 Implemented
OR0405 # 03 Y:2001 03 2001 INSTALL SENSORS TO DETECT AND AVOID JAMS $116,900 $20,000 Not Implemented
OR0405 # 02 Y:2001 02 2001 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $879,623 $145,450 Implemented
OR0405 # 07 Y:2001 07 2001 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,092 $13,700 Not Implemented
OR0405 # 01 Y:2001 01 2001 INSTALL EQUIPMENT TO MOVE PRODUCT $265,366 $900,000 Not Implemented
OR0405 # 04 Y:2001 04 2001 OPTIMIZE PLANT POWER FACTOR $17,987 $28,200 Implemented
OK0632 # 02 Y:2001 02 2001 INSTALL SET-BACK TIMERS $2,867 $250 Not Implemented
OK0632 # 08 Y:2001 08 2001 MOVE PRODUCT USING MECHANICAL MEANS $19,500 $2,500 Implemented
OK0632 # 09 Y:2001 09 2001 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $19,500 $2,305 Not Implemented
OK0632 # 03 Y:2001 03 2001 RECOVER WASTE HEAT FROM EQUIPMENT $451 $2,456 Implemented
OK0632 # 05 Y:2001 05 2001 INSTALL SET-BACK TIMERS $3,073 $940 Implemented
OK0632 # 06 Y:2001 06 2001 MOVE PRODUCT USING MECHANICAL MEANS $11,700 $2,112 Implemented
OK0632 # 01 Y:2001 01 2001 INSTALL OCCUPANCY SENSORS $130 $500 Not Implemented
OK0632 # 07 Y:2001 07 2001 MODIFY WORKLOAD $1,800 $0 Implemented
OK0632 # 04 Y:2001 04 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $936 $0 Implemented
MA0500 # 06 Y:2001 06 2001 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,262 $10,000 Not Implemented
MA0500 # 08 Y:2001 08 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,264 $2,000 Implemented
MA0500 # 07 Y:2001 07 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,051 $12,900 Not Implemented
MA0500 # 09 Y:2001 09 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,225 $5,950 Not Implemented