IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

163

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0045 # 05 Y:2009 05 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $48,659 $64,000 Implemented
TT0045 # 06 Y:2009 06 2009 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $182,907 $0 Not Implemented
TT0045 # 03 Y:2009 03 2009 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $13,478 $55,000 Not Implemented
TT0045 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,434 $45,960 Implemented
TT0045 # 02 Y:2009 02 2009 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $24,604 $76,000 Not Implemented
TT0045 # 01 Y:2009 01 2009 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $100,429 $34,284 Implemented
OR0551 # 04 Y:2009 04 2009 INSTALL OCCUPANCY SENSORS $28,320 $48,980 Implemented
OR0551 # 01 Y:2009 01 2009 UPGRADE CONTROLS ON COMPRESSORS $77,191 $50,820 Implemented
OR0551 # 05 Y:2009 05 2009 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $83,890 $100,800 Implemented
OR0551 # 03 Y:2009 03 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $29,500 $0 Not Implemented
OR0551 # 02 Y:2009 02 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $28,529 $42,146 Implemented
AM0564 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $690 $305 Implemented
AM0564 # 09 Y:2009 09 2009 USE SYNTHETIC LUBRICANT $260 $0 Implemented
AM0564 # 08 Y:2009 08 2009 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $450 $0 Implemented
AM0564 # 06 Y:2009 06 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $715 $0 Implemented
AM0564 # 05 Y:2009 05 2009 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,070 $0 Not Implemented
AM0564 # 04 Y:2009 04 2009 INSTALL SKYLIGHTS $6,040 $22,100 Not Implemented
AM0564 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,720 $1,000 Implemented
AM0564 # 02 Y:2009 02 2009 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $15,000 $25,000 Implemented
AM0564 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,930 $21,500 Implemented
OR0549 # 02 Y:2009 02 2009 PREHEAT COMBUSTION AIR WITH WASTE HEAT $46,600 $27,000 Not Implemented
OR0549 # 04 Y:2009 04 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,682 $0 Implemented
OR0549 # 03 Y:2009 03 2009 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $28,000 $700 Not Implemented
OR0549 # 01 Y:2009 01 2009 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $170,135 $100,000 Not Implemented
OR0549 # 05 Y:2009 05 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $8,800 $3,500 Implemented