IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

100

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0359 # 04 Y:2010 04 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $2,850 $2,432 Not Implemented
MS0359 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,778 $241 Implemented
MS0359 # 02 Y:2010 02 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,253 $1,635 Implemented
MS0359 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $67,464 $34,894 Not Implemented
LL0339 # 01 Y:2010 01 2010 REPAIR AND ELIMINATE STEAM LEAKS $271,505 $2,920 Implemented
LL0339 # 02 Y:2010 02 2010 INCREASE AMOUNT OF CONDENSATE RETURNED $204,298 $966,460 Implemented
LL0339 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $152,895 $42,400 Implemented
LL0339 # 04 Y:2010 04 2010 INSULATE BARE EQUIPMENT $31,760 $6,240 Not Implemented
LL0339 # 05 Y:2010 05 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,510 $10,605 Not Implemented
LL0339 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,365 $1,950 Not Implemented
LL0339 # 07 Y:2010 07 2010 INSTALL OCCUPANCY SENSORS $3,388 $1,950 Not Implemented
LL0339 # 08 Y:2010 08 2010 USE PHOTOCELL CONTROLS $1,302 $150 Not Implemented
LL0339 # 09 Y:2010 09 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $457 $623 Not Implemented
OR0564 # 05 Y:2010 05 2010 USE OPTIMUM THICKNESS INSULATION $64,658 $105,222 Implemented
OR0564 # 03 Y:2010 03 2010 UPGRADE CONTROLS ON COMPRESSORS $9,666 $40,000 Not Implemented
OR0564 # 04 Y:2010 04 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,849 $7,575 Not Implemented
OR0564 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $7,248 $31,290 Not Implemented
OR0564 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $31,314 $31,314 Implemented
OR0564 # 01 Y:2010 01 2010 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $11,375 $32,340 Not Implemented
OR0563 # 02 Y:2010 02 2010 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $219,003 $250,000 Implemented
OR0563 # 03 Y:2010 03 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $46,600 $244,000 Implemented
OR0563 # 04 Y:2010 04 2010 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,100,000 $2,150,000 Not Implemented
OR0563 # 01 Y:2010 01 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $35,913 $17,860 Not Implemented
OR0562 # 03 Y:2010 03 2010 RECOVER WASTE HEAT FROM EQUIPMENT $1,447 $2,724 Implemented
OR0562 # 04 Y:2010 04 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,192 $0 Implemented