IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

78

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0563 # 03 Y:2020 03 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,163 $0 Implemented
UF0563 # 01 Y:2020 01 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $24,451 $95,589 Not Implemented
UF0563 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,895 $3,125 Implemented
UF0563 # 05 Y:2020 05 2020 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $1,582 $735 Implemented
UF0563 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,026 $406 Implemented
UF0563 # 06 Y:2020 06 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $951 $0 Implemented
AM0810 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,320 $1,680 Implemented
AM0810 # 05 Y:2020 05 2020 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $370 $50 Implemented
AM0810 # 01 Y:2020 01 2020 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,200 $1,000 Implemented
AM0810 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,410 $180 Implemented
AM0810 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,245 $2,670 Implemented
AM0810 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $290 $20 Implemented
BS0141 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,094 $50 Not Implemented
BS0141 # 06 Y:2020 06 2020 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $36,736 $27,300 Not Implemented
BS0141 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $903 $3,300 Not Implemented
BS0141 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,407 $70,150 Not Implemented
BS0141 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,521 $1,100 Not Implemented
BS0141 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $68 $55 Not Implemented
MZ0298 # 05 Y:2020 05 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,537 $740 Implemented
MZ0298 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,238 $800 Not Implemented
MZ0298 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,824 $8,850 Implemented
MZ0298 # 04 Y:2020 04 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $544 $2,220 Implemented
MZ0298 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,146 $350 Implemented
MZ0298 # 08 Y:2020 08 2020 INSTALL OCCUPANCY SENSORS $1,093 $1,639 Implemented
MZ0298 # 09 Y:2020 09 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $29,362 $25,600 Not Implemented