IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

173

matching recommendations
Reset
SIC 242 Sawmills And Planing Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0274 # 09 Y:2003 09 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $26 $0 Implemented
WV0242 # 01 Y:2002 01 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,167 $0 Implemented
WV0242 # 02 Y:2002 02 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $611 $1,695 Not Implemented
WV0242 # 03 Y:2002 03 2002 UTILIZE A LESS EXPENSIVE COOLING METHOD $7,620 $4,870 Implemented
WV0242 # 04 Y:2002 04 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $871 $116 Not Implemented
WV0242 # 05 Y:2002 05 2002 RECOVER WASTE HEAT FROM EQUIPMENT $4,564 $128 Implemented
WV0242 # 06 Y:2002 06 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $456 $72 Implemented
WV0242 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $304 $0 Implemented
WV0242 # 08 Y:2002 08 2002 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $8,335 $900 Implemented
WV0242 # 09 Y:2002 09 2002 BURN WASTE OIL FOR HEAT $5,537 $4,000 Not Implemented
WV0242 # 10 Y:2002 10 2002 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $864 $400 Implemented
WV0242 # 11 Y:2002 11 2002 INSTALL SENSORS TO DETECT DEFECTS $127,500 $13,480 Not Implemented
WV0242 # 12 Y:2002 12 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $28,000 $12,000 Not Implemented
WV0217 # 01 Y:2001 01 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,319 $1,925 Implemented
WV0217 # 02 Y:2001 02 2001 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,187 $0 Implemented
WV0217 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,084 $54 Implemented
WV0217 # 04 Y:2001 04 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,646 $162 Implemented
WV0217 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,433 $68 Implemented
WV0217 # 06 Y:2001 06 2001 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $8,151 $270 Implemented
WV0217 # 07 Y:2001 07 2001 BURN WOOD BY-PRODUCTS FOR HEAT $136,561 $325,000 Not Implemented
WV0217 # 08 Y:2001 08 2001 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $16,050 $15,248 Implemented
WV0217 # 09 Y:2001 09 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $20,000 $30,000 Not Implemented
WV0184 # 01 Y:2000 01 2000 RECOVER WASTE HEAT FROM EQUIPMENT $6,707 $280 Implemented
WV0184 # 02 Y:2000 02 2000 REDUCE VENTILATION AIR $694 $1,170 Not Implemented
WV0184 # 03 Y:2000 03 2000 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $33,886 $10,000 Implemented