Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
Reset
SIC 242 Sawmills And Planing Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0836 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,500 $1,700 Not Implemented
OK0836 # 07 Y:2012 07 2012 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $248,000 $675,000 Not Implemented
OK0836 # 08 Y:2012 08 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $12,700 $13,000 Not Implemented
OK0836 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,200 $27,500 Not Implemented
OK0836 # 05 Y:2012 05 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,000 $500 Implemented
OK0836 # 04 Y:2012 04 2012 UPGRADE CONTROLS ON COMPRESSORS $28,900 $15,100 Implemented
OK0836 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,400 $10,000 Implemented
OK0836 # 06 Y:2012 06 2012 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $7,200 $1,000 Implemented
CO0666 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,710 $1,000 Implemented
CO0666 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,240 $155,860 Not Implemented
CO0666 # 04 Y:2012 04 2012 OPTIMIZE PLANT POWER FACTOR $30,160 $56,610 Not Implemented
CO0666 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,730 $13,270 Not Implemented
CO0666 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,630 $32,970 Not Implemented
CO0666 # 03 Y:2012 03 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,090 $430 Not Implemented
BS0005 # 02 Y:2012 02 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,970 $609 Implemented
BS0005 # 06 Y:2012 06 2012 INSULATE BARE EQUIPMENT $11,990 $17,000 Not Implemented
BS0005 # 05 Y:2012 05 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $1,653 $7,846 Not Implemented
BS0005 # 04 Y:2012 04 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,615 $10,000 Implemented
BS0005 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $2,733 $178 Implemented
BS0005 # 01 Y:2012 01 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $265 $555 Not Implemented
TT0096 # 06 Y:2012 06 2012 RECOVER AND REUSE WASTE MATERIAL $330,000 $630,000 Not Implemented
TT0096 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $463 $0 Implemented
TT0096 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,193 $1,753 Not Implemented
TT0096 # 03 Y:2012 03 2012 REPAIR AND ELIMINATE STEAM LEAKS $26,105 $10,000 Implemented
TT0096 # 04 Y:2012 04 2012 UPGRADE CONTROLS ON COMPRESSORS $1,892 $1,000 Implemented