IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

86

matching recommendations
Reset
SIC 2421 Sawmills And Planing Mills, General
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0500 # 02 Y:2001 02 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $41,719 $45,000 Not Implemented
MA0500 # 03 Y:2001 03 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,719 $20,000 Not Implemented
MA0500 # 04 Y:2001 04 2001 OPTIMIZE PLANT POWER FACTOR $14,725 $35,000 Implemented
MA0500 # 05 Y:2001 05 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,562 $18,000 Not Implemented
MA0500 # 06 Y:2001 06 2001 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,262 $10,000 Not Implemented
MA0500 # 07 Y:2001 07 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,051 $12,900 Not Implemented
MA0500 # 08 Y:2001 08 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,264 $2,000 Implemented
MA0500 # 09 Y:2001 09 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,225 $5,950 Not Implemented
MA0500 # 01 Y:2001 01 2001 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $47,575 $350,000 Not Implemented
ME0303 # 03 Y:2000 03 2000 USE PHOTOCELL CONTROLS $11,195 $4,080 Not Implemented
ME0303 # 01 Y:2000 01 2000 OPTIMIZE PLANT POWER FACTOR $252,792 $97,800 Not Implemented
ME0303 # 02 Y:2000 02 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $49,880 $44,850 Not Implemented
ME0303 # 06 Y:2000 06 2000 ADD ADDITIONAL PRODUCTION SHIFT $480,000 $0 Not Implemented
ME0303 # 04 Y:2000 04 2000 BURN WOOD BY-PRODUCTS FOR HEAT $631,036 $1,864,500 Not Implemented
ME0303 # 05 Y:2000 05 2000 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $184,216 $324,000 Not Implemented
ME0302 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,862 $9,010 Not Implemented
ME0302 # 02 Y:2000 02 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,137 $6,000 Not Implemented
ME0302 # 05 Y:2000 05 2000 ADD ADDITIONAL PRODUCTION SHIFT $1,000,000 $0 Not Implemented
ME0302 # 04 Y:2000 04 2000 BURN WOOD BY-PRODUCTS FOR HEAT $879,619 $2,084,500 Not Implemented
ME0302 # 01 Y:2000 01 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $46,620 $42,550 Not Implemented
ME0298 # 04 Y:2000 04 2000 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $241 $450 Not Implemented
ME0298 # 01 Y:2000 01 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,240 $66,900 Implemented
ME0298 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,062 $5,845 Not Implemented
ME0298 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,392 $340 Implemented
ME0298 # 05 Y:2000 05 2000 INSULATE FEEDWATER TANK $88 $250 Not Implemented