IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,121

matching recommendations
Reset
SIC 243 Millwork, Plywood & Structural
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0309 # 01 Y:2001 01 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,341 $3,800 Implemented
AS0309 # 02 Y:2001 02 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $426 $480 Implemented
AS0309 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $305 $60 Implemented
AS0309 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $962 $4,006 Implemented
AS0309 # 06 Y:2001 06 2001 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $585 $1,400 Implemented
AS0309 # 07 Y:2001 07 2001 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $5,413 $60 Implemented
AS0309 # 08 Y:2001 08 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $2,773 $685 Implemented
NC0222 # 06 Y:2001 06 2001 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $3,000 $1,000 Implemented
WI0402 # 03 Y:2001 03 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $17,905 $8,955 Implemented
WI0402 # 10 Y:2001 10 2001 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,181 $0 Implemented
IA0270 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,344 $160 Implemented
IA0270 # 04 Y:2001 04 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $949 $120 Implemented
IA0270 # 05 Y:2001 05 2001 RECOVER WASTE HEAT FROM EQUIPMENT $651 $1,176 Implemented
IA0265 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,585 $989 Implemented
IA0265 # 04 Y:2001 04 2001 AVOID CONTAMINATION OF END PIECES AND REUSE AS FEED STOCK $18,000 $22,100 Implemented
IA0265 # 06 Y:2001 06 2001 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $11,603 $1,088 Implemented
AM0396 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,830 $100 Implemented
AM0396 # 03 Y:2001 03 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $2,240 $0 Implemented
AM0396 # 04 Y:2001 04 2001 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,980 $3,960 Implemented
AM0396 # 05 Y:2001 05 2001 RECOVER WASTE HEAT FROM EQUIPMENT $1,460 $500 Implemented
AM0390 # 02 Y:2001 02 2001 INSTALL EQUIPMENT TO MOVE PRODUCT $51,050 $150,000 Implemented
AM0390 # 06 Y:2001 06 2001 RECOVER AND REUSE WASTE MATERIAL $1,600 $0 Implemented
AM0390 # 07 Y:2001 07 2001 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,545 $3,090 Implemented
AM0390 # 09 Y:2001 09 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,100 $200 Implemented
AM0390 # 10 Y:2001 10 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,080 $50 Implemented