IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 243 Millwork, Plywood & Structural
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW0005 # 05 Y:2007 05 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,388 $2,619 Implemented
UW0005 # 03 Y:2007 03 2007 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $3,246 $1,162 Implemented
UW0005 # 08 Y:2007 08 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,795 $398 Implemented
UW0005 # 07 Y:2007 07 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,766 $432 Implemented
UW0005 # 02 Y:2007 02 2007 REPOSITION OVEN WALLS TO REDUCE HEATED SPACE $15,876 $4,452 Implemented
UW0005 # 01 Y:2007 01 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,804 $7,172 Implemented
OR0496 # 08 Y:2006 08 2006 USE PHOTOCELL CONTROLS $2,400 $900 Implemented
OR0496 # 06 Y:2006 06 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $33,700 $91,000 Implemented
OR0496 # 04 Y:2006 04 2006 DIRECT WARMEST AIR TO COMBUSTION INTAKE $66,800 $118,000 Implemented
OR0496 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $201,300 $301,500 Implemented
OR0496 # 02 Y:2006 02 2006 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $282,000 $212,000 Implemented
OR0476 # 03 Y:2005 03 2005 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $9,028 $600 Implemented
OR0436 # 02 Y:2003 02 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,530 $0 Implemented
OR0436 # 05 Y:2003 05 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $48,169 $66,400 Implemented
OR0436 # 04 Y:2003 04 2003 UPGRADE CONTROLS ON COMPRESSORS $8,380 $6,780 Implemented
OR0436 # 01 Y:2003 01 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $16,500 $7,680 Implemented
OR0241 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $334 $1,203 Implemented
OR0241 # 01 Y:1995 01 1995 ADD AREA LIGHTING SWITCHES $5,534 $0 Implemented
OR0123 # 05 Y:1991 05 1991 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $16,124 $0 Implemented
OR0123 # 04 Y:1991 04 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $181 $691 Implemented
OR0123 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,873 $0 Implemented
OR0123 # 02 Y:1991 02 1991 OPTIMIZE PLANT POWER FACTOR $3,011 $4,800 Implemented
OR0123 # 01 Y:1991 01 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,687 $4,200 Implemented
OR0068 # 02 Y:1989 02 1989 INSTALL SET-BACK TIMERS $5,010 $0 Implemented
OR0068 # 05 Y:1989 05 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,867 $2,499 Implemented