IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,511

matching recommendations
Reset
SIC 243 Millwork, Plywood & Structural
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0106 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,194 $862 Implemented
MI0106 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,390 $56 Implemented
MI0106 # 06 Y:2005 06 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $834 $600 Not Implemented
MI0106 # 07 Y:2005 07 2005 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $756 $1,536 Not Implemented
AM0492 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,500 $500 Implemented
AM0492 # 02 Y:2005 02 2005 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $9,500 $20,000 Implemented
AM0492 # 03 Y:2005 03 2005 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $4,800 $0 Implemented
AM0492 # 04 Y:2005 04 2005 SELL COMBUSTIBLE WASTE $3,600 $500 Not Implemented
AM0492 # 05 Y:2005 05 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,800 $1,230 Implemented
AM0492 # 06 Y:2005 06 2005 INSTALL SKYLIGHTS $1,300 $3,670 Implemented
AM0492 # 07 Y:2005 07 2005 INSTALL TIMERS AND/OR THERMOSTATS $600 $100 Implemented
AM0492 # 08 Y:2005 08 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $275 $14 Not Implemented
IA0363 # 01 Y:2005 01 2005 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $5,128 $1,344 Not Implemented
IA0363 # 02 Y:2005 02 2005 RECOVER WASTE HEAT FROM EQUIPMENT $20,682 $12,835 Not Implemented
IA0363 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,962 $1,023 Implemented
IA0363 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,383 $15,627 Implemented
IA0363 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $971 $2,171 Not Implemented
IA0363 # 06 Y:2005 06 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $20,328 $0 Implemented
IA0363 # 07 Y:2005 07 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,742 $95 Not Implemented
IA0363 # 08 Y:2005 08 2005 INSTALL OCCUPANCY SENSORS $859 $1,617 Not Implemented
OR0476 # 01 Y:2005 01 2005 INSTALL SENSORS TO DETECT DEFECTS $59,097 $38,400 Not Implemented
OR0476 # 02 Y:2005 02 2005 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,039,000 $1,200,000 Not Implemented
OR0476 # 03 Y:2005 03 2005 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $9,028 $600 Implemented
OR0476 # 04 Y:2005 04 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $32,100 $47,900 Not Implemented
WI0482 # 01 Y:2005 01 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $29,756 $55,500 Not Implemented