IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
SIC 243 Millwork, Plywood & Structural
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0264 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,745 $4,870 Implemented
UA0264 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,878 $500 Implemented
UA0264 # 03 Y:2022 03 2022 RECOVER WASTE HEAT FROM EQUIPMENT $9,549 $8,397 Implemented
UA0264 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,563 $1,200 Implemented
UA0260 # 02 Y:2022 02 2022 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $3,710 $1,651 Implemented
UA0260 # 05 Y:2022 05 2022 OPTIMIZE PLANT POWER FACTOR $90,617 $35,347 Implemented
UA0230 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,808 $1,868 Implemented
UA0230 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,204 $50 Implemented
UA0230 # 04 Y:2020 04 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $229 $50 Implemented
UA0176 # 02 Y:2017 02 2017 INSTALL OCCUPANCY SENSORS $9,077 $16,027 Implemented
UA0176 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,273 $2,645 Implemented
UA0176 # 01 Y:2017 01 2017 INSTALL TIMERS AND/OR THERMOSTATS $29,064 $1,800 Implemented
UA0163 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $42,679 $9,795 Implemented
UA0163 # 05 Y:2016 05 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,032 $900 Implemented
UA0156 # 01 Y:2016 01 2016 INSULATE FEEDWATER TANK $34,968 $50,000 Implemented
UA0156 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $78,495 $82,466 Implemented
UA0156 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $28,560 $700 Implemented
UA0150 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,229 $2,995 Implemented
UA0150 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,195 $800 Implemented
UA0129 # 08 Y:2014 08 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,212 $7,095 Implemented
UA0129 # 05 Y:2014 05 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $44,851 $100 Implemented
UA0129 # 04 Y:2014 04 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $263 $331 Implemented
UA0129 # 02 Y:2014 02 2014 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $34,652 $100 Implemented
UA0088 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,558 $22,841 Implemented
UA0088 # 02 Y:2012 02 2012 USE PHOTOCELL CONTROLS $687 $651 Implemented