IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

63

matching recommendations
Reset
SIC 243 Millwork, Plywood & Structural
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW2312 # 02 Y:2023 02 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,868 $20 n/a
UW2312 # 03 Y:2023 03 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,841 $1,520 n/a
UW2312 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $10,128 $13,235 n/a
UW2312 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $236,659 $2,614,888 n/a
UW2312 # 01 Y:2023 01 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,943 $30,989 n/a
OR0701 # 02 Y:2018 02 2018 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $17,929 $8,549 Not Implemented
OR0701 # 01 Y:2018 01 2018 INSTALL SYSTEM TO COLLECT SCRAP $35,903 $29,900 Not Implemented
OR0701 # 03 Y:2018 03 2018 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $11,954 $11,773 Not Implemented
OR0701 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,441 $4,175 Not Implemented
OR0686 # 02 Y:2017 02 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $5,219 $0 Not Implemented
OR0686 # 06 Y:2017 06 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,743 $500 Not Implemented
OR0686 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,115 $16,115 Not Implemented
OR0686 # 04 Y:2017 04 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,155 $0 Not Implemented
OR0686 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,997 $1,200 Not Implemented
OR0686 # 01 Y:2017 01 2017 DEVELOP STANDARD OPERATING PROCEDURES $181,947 $31,400 Not Implemented
UW0005 # 09 Y:2007 09 2007 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $354 $650 Not Implemented
UW0005 # 01 Y:2007 01 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,804 $7,172 Implemented
UW0005 # 02 Y:2007 02 2007 REPOSITION OVEN WALLS TO REDUCE HEATED SPACE $15,876 $4,452 Implemented
UW0005 # 03 Y:2007 03 2007 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $3,246 $1,162 Implemented
UW0005 # 04 Y:2007 04 2007 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $8,530 $1,852 Not Implemented
UW0005 # 05 Y:2007 05 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,388 $2,619 Implemented
UW0005 # 06 Y:2007 06 2007 OPTIMIZE PLANT POWER FACTOR $6,971 $17,098 Not Implemented
UW0005 # 07 Y:2007 07 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,766 $432 Implemented
UW0005 # 08 Y:2007 08 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,795 $398 Implemented
OR0496 # 11 Y:2006 11 2006 UPGRADE CONTROLS ON COMPRESSORS $415 $600 Not Implemented