IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
SIC 2431 Millwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0462 # 10 Y:2012 10 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $528 $508 Not Implemented
NC0462 # 03 Y:2012 03 2012 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $8,910 $20,000 Not Implemented
NC0462 # 02 Y:2012 02 2012 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $107,890 $305,000 Not Implemented
NC0462 # 01 Y:2012 01 2012 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $21,080 $25,000 Not Implemented
NC0462 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,190 $400 Implemented
NC0462 # 05 Y:2012 05 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $102 $200 Implemented
NC0462 # 06 Y:2012 06 2012 RECOVER WASTE HEAT FROM EQUIPMENT $7,686 $11,000 Implemented
NC0462 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,392 $8,400 Implemented
NC0462 # 08 Y:2012 08 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,997 $18,991 Implemented
NC0462 # 09 Y:2012 09 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $174 $220 Implemented
NC0222 # 01 Y:2001 01 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,083 $25 Not Implemented
NC0222 # 02 Y:2001 02 2001 USE PHOTOCELL CONTROLS $751 $525 Not Implemented
NC0222 # 03 Y:2001 03 2001 DEVELOP A REPAIR/REPLACE POLICY $2,652 $9,152 Not Implemented
NC0222 # 04 Y:2001 04 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,678 $0 Not Implemented
NC0222 # 05 Y:2001 05 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $3,960 $5,000 Not Implemented
NC0222 # 06 Y:2001 06 2001 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $3,000 $1,000 Implemented
NC0191 # 02 Y:2000 02 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,096 $1,753 Implemented
NC0191 # 08 Y:2000 08 2000 RESCHEDULE BREAKS TO ALLOW FOR CONTINUOUS PRODUCTION $6,729 $288 Not Implemented
NC0191 # 07 Y:2000 07 2000 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,556 $1,000 Implemented
NC0191 # 06 Y:2000 06 2000 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $29,945 $40,000 Implemented
NC0191 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $701 $0 Implemented
NC0191 # 04 Y:2000 04 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $593 $0 Not Implemented
NC0191 # 03 Y:2000 03 2000 INSULATE BARE EQUIPMENT $545 $1,050 Implemented
NC0191 # 01 Y:2000 01 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,005 $1,000 Implemented
TN0432 # 01 Y:1991 01 1991 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $112,175 $326,250 Not Implemented