IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17

matching recommendations
Reset
SIC 2435 Hardwood Veneer And Plywood
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0416 # 07 Y:2008 07 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,708 $1,477 Implemented
UF0416 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,217 $0 Implemented
UF0416 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $70,300 $53,500 Implemented
UF0416 # 01 Y:2008 01 2008 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $950 $4,000 Implemented
UF0205 # 05 Y:1998 05 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $3,075 $471 Implemented
UF0205 # 11 Y:1998 11 1998 UPGRADE CONVEYORS $84,000 $10,500 Implemented
UF0205 # 10 Y:1998 10 1998 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $17,160 $10,000 Implemented
UF0205 # 09 Y:1998 09 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $9,360 $10,320 Implemented
UF0205 # 06 Y:1998 06 1998 OPTIMIZE PLANT POWER FACTOR $13,598 $40,806 Implemented
UF0205 # 04 Y:1998 04 1998 OPTIMIZE PLANT POWER FACTOR $31,516 $22,000 Implemented
UF0205 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,997 $3,200 Implemented
UF0205 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,940 $10,390 Implemented
UF0173 # 03 Y:1997 03 1997 REPAIR OR REPLACE STEAM TRAPS $1,315 $138 Implemented
UF0173 # 02 Y:1997 02 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,649 $1,000 Implemented
UF0173 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $380 $381 Implemented
UF0126 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $46,162 $114,584 Implemented
UF0126 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $25,132 $2,000 Implemented