Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
508
matching recommendationsSIC | 245 | Wood Buildings And Mobile Homes |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0519 # 05 Y:2022 | 05 | 2022 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $4,322 | $7,738 | Implemented |
AS0519 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,189 | $17,273 | Implemented |
AS0519 # 03 Y:2022 | 03 | 2022 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $12,742 | $43,469 | Not Implemented |
AS0519 # 02 Y:2022 | 02 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $30,335 | $11,420 | Implemented |
AS0519 # 01 Y:2022 | 01 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $65,138 | $509,120 | Implemented |
UF0563 # 03 Y:2020 | 03 | 2020 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,163 | $0 | Implemented |
UF0563 # 05 Y:2020 | 05 | 2020 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $1,582 | $735 | Implemented |
UF0563 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,026 | $406 | Implemented |
UF0563 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,895 | $3,125 | Implemented |
UF0563 # 06 Y:2020 | 06 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $951 | $0 | Implemented |
UF0563 # 01 Y:2020 | 01 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $24,451 | $95,589 | Not Implemented |
OR0722 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,107 | $0 | Implemented |
OR0722 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,488 | $1,110 | Not Implemented |
OR0722 # 07 Y:2019 | 07 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,941 | $15,179 | Not Implemented |
OR0722 # 06 Y:2019 | 06 | 2019 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $28,751 | $129,960 | Not Implemented |
OR0722 # 01 Y:2019 | 01 | 2019 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $42,047 | $1,000 | Implemented |
OR0722 # 03 Y:2019 | 03 | 2019 | USE OPTIMUM TEMPERATURE | $6,191 | $0 | Not Implemented |
OR0722 # 02 Y:2019 | 02 | 2019 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $17,875 | $0 | Implemented |
MA0807 # 06 Y:2019 | 06 | 2019 | INSTALL / REPAIR INSULATION ON STEAM LINES | $558 | $470 | Implemented |
MA0807 # 05 Y:2019 | 05 | 2019 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $1,241 | $5,413 | Implemented |
MA0807 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,356 | $9,356 | Implemented |
MA0807 # 01 Y:2019 | 01 | 2019 | REDUCE VENTILATION AIR | $10,917 | $100 | Implemented |
MA0807 # 03 Y:2019 | 03 | 2019 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,808 | $17,300 | Not Implemented |
MA0807 # 04 Y:2019 | 04 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,547 | $10,850 | Not Implemented |
BS0090 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,391 | $2,653 | Implemented |