IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

39

matching recommendations
Reset
SIC 2451 Mobile Homes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0794 # 06 Y:2024 06 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $13,489 $12,623 n/a
OR0794 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,153 $7,546 n/a
OR0794 # 04 Y:2024 04 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $12,662 $67,250 n/a
OR0794 # 03 Y:2024 03 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $20,545 $92,473 n/a
OR0794 # 02 Y:2024 02 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,287 $5,523 n/a
OR0794 # 01 Y:2024 01 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,236 $1,629 n/a
OR0755 # 04 Y:2022 04 2022 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,507,357 $45,058 Not Implemented
OR0755 # 01 Y:2022 01 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,233 $0 Not Implemented
OR0755 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,881 $0 Not Implemented
OR0755 # 03 Y:2022 03 2022 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $4,555 $0 Not Implemented
OR0755 # 05 Y:2022 05 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,503 $23,536 Not Implemented
OR0755 # 06 Y:2022 06 2022 OPTIMIZE PLANT POWER FACTOR $13,297 $55,141 Not Implemented
OR0755 # 07 Y:2022 07 2022 REPLACE BOILER $3,641,663 $6,124,080 Not Implemented
OR0569 # 06 Y:2011 06 2011 USE SOLAR HEAT TO MAKE ELECTRICTY $10,600 $38,900 Not Implemented
OR0569 # 05 Y:2011 05 2011 INSTALL OCCUPANCY SENSORS $17,900 $58,500 Implemented
OR0569 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $517 $517 Implemented
OR0569 # 03 Y:2011 03 2011 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $3,890 $500 Not Implemented
OR0569 # 02 Y:2011 02 2011 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $5,650 $700 Implemented
OR0569 # 01 Y:2011 01 2011 USE OPTIMUM TEMPERATURE $9,149 $450 Implemented
OR0566 # 05 Y:2011 05 2011 USE SOLAR HEAT TO MAKE ELECTRICTY $15,200 $146,000 Not Implemented
OR0566 # 04 Y:2011 04 2011 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $8,620 $37,500 Not Implemented
OR0566 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,690 $1,690 Implemented
OR0566 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $4,340 $9,990 Implemented
OR0566 # 01 Y:2011 01 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,230 $635 Implemented
OR0370 # 02 Y:2000 02 2000 USE OPTIMUM TEMPERATURE $4,900 $650 Implemented