IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

185

matching recommendations
Reset
SIC 249 Miscellaneous Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0767 # 02 Y:2023 02 2023 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $172,773 $37,200 Implemented
OR0767 # 03 Y:2023 03 2023 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $300,390 $200,000 Implemented
OR0767 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,428 $5,428 Not Implemented
OR0767 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,167 $14,238 Not Implemented
OR0767 # 01 Y:2023 01 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,793 $0 Not Implemented
OR0718 # 03 Y:2019 03 2019 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $7,386 $27,337 Not Implemented
OR0718 # 02 Y:2019 02 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $47,893 $5,142 Not Implemented
OR0718 # 01 Y:2019 01 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $84,306 $71,155 Not Implemented
OR0679 # 01 Y:2016 01 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $74,285 $6,200 Implemented
OR0679 # 04 Y:2016 04 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $31,513 $47,575 Implemented
OR0679 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,613 $47,385 Implemented
OR0679 # 06 Y:2016 06 2016 REPLACE BOILER $48,912 $250,000 Not Implemented
OR0679 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,003 $10,369 Not Implemented
OR0679 # 02 Y:2016 02 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $20,472 $0 Implemented
OR0676 # 01 Y:2016 01 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,742 $0 Not Implemented
OR0676 # 02 Y:2016 02 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,729 $6,828 Not Implemented
OR0676 # 03 Y:2016 03 2016 REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS $216,607 $80,000 Implemented
OR0676 # 04 Y:2016 04 2016 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $11,774 $7,200 Implemented
OR0676 # 05 Y:2016 05 2016 ADD AREA LIGHTING SWITCHES $1,356 $1,062 Implemented
OR0676 # 06 Y:2016 06 2016 INSULATE BARE EQUIPMENT $2,884 $6,584 Implemented
OR0664 # 01 Y:2016 01 2016 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $2,739 $0 Not Implemented
OR0664 # 02 Y:2016 02 2016 INSULATE BARE EQUIPMENT $1,310 $2,584 Not Implemented
OR0664 # 03 Y:2016 03 2016 INSTALL SPECTRAL REFLECTORS / DELAMP $12,507 $32,393 Implemented
OR0664 # 04 Y:2016 04 2016 UPGRADE CONVEYORS $74,609 $242,718 Not Implemented
OR0657 # 02 Y:2015 02 2015 INSULATE BARE EQUIPMENT $24,174 $32,596 Not Implemented