IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

418

matching recommendations
Reset
SIC 2493 Reconstituted Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0416 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $284 $568 Implemented
NC0416 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,679 $30,438 Not Implemented
NC0416 # 04 Y:2010 04 2010 RECOVER WASTE HEAT FROM EQUIPMENT $11,462 $6,800 Not Implemented
NC0416 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,948 $100 Implemented
NC0416 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,117 $50 Implemented
NC0416 # 01 Y:2010 01 2010 KEEP BOILER TUBES CLEAN $359,066 $411,700 Not Implemented
OR0549 # 05 Y:2009 05 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $8,800 $3,500 Implemented
OR0549 # 04 Y:2009 04 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,682 $0 Implemented
OR0549 # 03 Y:2009 03 2009 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $28,000 $700 Not Implemented
OR0549 # 02 Y:2009 02 2009 PREHEAT COMBUSTION AIR WITH WASTE HEAT $46,600 $27,000 Not Implemented
OR0549 # 01 Y:2009 01 2009 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $170,135 $100,000 Not Implemented
UF0425 # 01 Y:2009 01 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,286 $0 Not Implemented
UF0425 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,129 $456 Implemented
UF0425 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $61,944 $21,313 Implemented
UF0425 # 04 Y:2009 04 2009 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $6,908 $1,600 Implemented
UF0425 # 05 Y:2009 05 2009 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $14,600 $12,400 Not Implemented
UF0425 # 06 Y:2009 06 2009 DEVELOP A REPAIR/REPLACE POLICY $1,195 $0 Implemented
UF0425 # 07 Y:2009 07 2009 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $41,811 $2,400 Implemented
UF0425 # 08 Y:2009 08 2009 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $2,702 $1,800 Implemented
UF0425 # 09 Y:2009 09 2009 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $52,516 $31,860 Implemented
UF0425 # 10 Y:2009 10 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $59,018 $139,322 Implemented
UF0425 # 11 Y:2009 11 2009 CONTRACT A WOOD PALLET RECYCLING COMPANY $525 $0 Not Implemented
OR0537 # 08 Y:2008 08 2008 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $179,500 $279,600 Not Implemented
OR0537 # 07 Y:2008 07 2008 USE OPTIMUM THICKNESS INSULATION $11,928 $5,611 Not Implemented
OR0537 # 06 Y:2008 06 2008 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,113 $0 Implemented