IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 2499 Wood Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0141 # 06 Y:2020 06 2020 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $36,736 $27,300 Not Implemented
BS0141 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,407 $70,150 Not Implemented
BS0141 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,521 $1,100 Not Implemented
BS0141 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $68 $55 Not Implemented
BS0141 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $903 $3,300 Not Implemented
BS0141 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,094 $50 Not Implemented
BS0089 # 02 Y:2016 02 2016 UPGRADE CONTROLS ON COMPRESSORS $7,566 $6,400 Not Implemented
BS0089 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,610 $15,011 Not Implemented
BS0089 # 07 Y:2016 07 2016 OPTIMIZE PLANT POWER FACTOR $15,910 $115,903 Not Implemented
BS0089 # 06 Y:2016 06 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $5,303 $1,200 Not Implemented
BS0089 # 05 Y:2016 05 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,760 $4,580 Not Implemented
BS0089 # 04 Y:2016 04 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,615 $4,480 Not Implemented
BS0089 # 03 Y:2016 03 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,855 $654 Not Implemented
BS0089 # 01 Y:2016 01 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,075 $353 Not Implemented
OR0374 # 01 Y:2000 01 2000 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $152,880 $600,000 Not Implemented
OR0374 # 02 Y:2000 02 2000 USE PHOTOCELL CONTROLS $2,537 $1,000 Not Implemented
OR0374 # 03 Y:2000 03 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,481 $18,298 Implemented
OR0374 # 04 Y:2000 04 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $145 $500 Not Implemented
OR0368 # 01 Y:2000 01 2000 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $18,890 $30,000 Not Implemented
OR0368 # 02 Y:2000 02 2000 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $43,540 $401,460 Not Implemented
OR0368 # 03 Y:2000 03 2000 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $10,000 $4,040 Implemented
OR0368 # 04 Y:2000 04 2000 ADD ADDITIONAL PRODUCTION SHIFT $5,000 $0 Implemented
OR0368 # 05 Y:2000 05 2000 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $1,515 $1,500 Not Implemented