IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

127

matching recommendations
Reset
SIC 25 Furniture And Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1088 # 05 Y:2024 05 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,017 $0 n/a
UD1088 # 03 Y:2024 03 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,590 $400 n/a
UD1088 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,430 $48,200 n/a
UD1088 # 02 Y:2024 02 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,698 $6,900 n/a
UD1088 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,165 $953 n/a
UD1088 # 06 Y:2024 06 2024 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $392 $1,225 n/a
WV0510 # 05 Y:2015 05 2015 OPTIMIZE PLANT POWER FACTOR $9,408 $24,300 Not Implemented
WV0510 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $9,890 $3,930 Implemented
WV0510 # 08 Y:2015 08 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,904 $537 Implemented
WV0510 # 07 Y:2015 07 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,050 $0 Implemented
WV0510 # 03 Y:2015 03 2015 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $15,681 $1,000 Implemented
WV0510 # 09 Y:2015 09 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,824 $2,324 Not Implemented
WV0510 # 10 Y:2015 10 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,881 $46 Implemented
WV0510 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $65,610 $211,134 Not Implemented
WV0510 # 06 Y:2015 06 2015 DEVELOP A REPAIR/REPLACE POLICY $5,855 $1,108 Implemented
WV0510 # 11 Y:2015 11 2015 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,210 $7,073 Not Implemented
WV0510 # 02 Y:2015 02 2015 INSULATE BARE EQUIPMENT $47,885 $8,730 Not Implemented
UD0919 # 13 Y:2015 13 2015 CLEAN FOULING FROM WATER LINES REGULARLY $5,080 $2,750 Not Implemented
UD0919 # 11 Y:2015 11 2015 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $242 $700 Not Implemented
UD0919 # 10 Y:2015 10 2015 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $2,652 $5,000 Not Implemented
UD0919 # 07 Y:2015 07 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $11,674 $0 Implemented
UD0919 # 06 Y:2015 06 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,496 $2,295 Not Implemented
UD0919 # 04 Y:2015 04 2015 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $29,266 $9,200 Implemented
UD0919 # 01 Y:2015 01 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,757 $0 Implemented
UD0919 # 02 Y:2015 02 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,792 $0 Implemented