IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

774

matching recommendations
Reset
SIC 251 Household Furniture
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0205 # 03 Y:2002 03 2002 OPTIMIZE PLANT POWER FACTOR $2,794 $4,590 Implemented
MS0205 # 04 Y:2002 04 2002 USE SYNTHETIC LUBRICANT $1,401 $396 Implemented
MS0205 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $463 $136 Implemented
MS0205 # 06 Y:2002 06 2002 DISCONNECT BALLASTS $438 $600 Implemented
UM0210 # 01 Y:2002 01 2002 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $43,964 $148,000 Implemented
UM0210 # 03 Y:2002 03 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,037 $6,600 Implemented
UM0210 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,984 $450 Implemented
UM0210 # 05 Y:2002 05 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $778 $900 Implemented
MS0203 # 02 Y:2002 02 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $30,947 $16,790 Implemented
MS0203 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,736 $1,189 Implemented
MS0203 # 05 Y:2002 05 2002 OPTIMIZE PLANT POWER FACTOR $4,266 $3,600 Implemented
WI0410 # 01 Y:2002 01 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $8,178 $4,800 Implemented
WI0410 # 02 Y:2002 02 2002 INSTALL TIMERS AND/OR THERMOSTATS $5,395 $600 Implemented
WI0410 # 06 Y:2002 06 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,015 $1,657 Implemented
WI0410 # 08 Y:2002 08 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $942 $740 Implemented
AS0313 # 01 Y:2001 01 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $2,092 $1,500 Implemented
AS0313 # 02 Y:2001 02 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $311 $1,254 Implemented
AS0313 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,661 $180 Implemented
AS0313 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,639 $24,888 Implemented
AS0313 # 09 Y:2001 09 2001 $49,133 $8,028 Implemented
NC0227 # 07 Y:2001 07 2001 CONTROL PRESSURE ON STEAMER OPERATIONS $7,356 $7,500 Implemented
NC0227 # 10 Y:2001 10 2001 DEVELOP A REPAIR/REPLACE POLICY $2,636 $4,205 Implemented
NC0227 # 12 Y:2001 12 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $824 $1,210 Implemented
NC0227 # 13 Y:2001 13 2001 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $8,933 $10,067 Implemented
NC0227 # 14 Y:2001 14 2001 $279,320 $500,000 Implemented